shape

Public Works

 Description  Opening Date  Closing Date/Time  Last Updated
WT19005/ATPCML-5008(189) - Readvertised
SAFE ROUTES TO SCHOOL SAFETY AND CONNECTIVITY IMPROVEMENTS
Construct bike lanes, missing sidewalk segments, install high visibility crosswalks, flashing beacons, and curb ramps.
May 01, 2024 June 06, 2024 2:00 PM May 01, 2024

OM-24-140
PURCHASE OF SEDANS, VANS  AND SUVS
April 26, 2024 May 23, 2024 2:00 PM April 26, 2024

WT23040/HSIPSL-5008(211)
REQUEST FOR PROPOSALS (RFP)
HAMMER LANE TRAFFIC SAFETY IMPROVEMENTS
Provide professional services to prepare plans, specifications, estimate, and provide design support during construction on Hammer Lane from Lower Sacramento Road to Tam O'Shanter Drive.
April 15, 2024 May 14, 2024 3:00 PM April 15, 2024

WT19007
REQUEST FOR PROPOSALS (RFP)
LOWER SACRAMENTO ROAD WIDENING AND BRIDGE REPLACEMENTS
Provide professional engineering services to prepare a Precise Road Plan, Project Study Report, environmental documents, and final design documents leading to the widening of Lower Sacramento Road between Pixley Slough and Royal Oaks Drive, a culvert replacement, and bridge replacements at Bear Creek and Pixley Slough.
April 10, 2024 May 29, 2024 3:00 April 10, 2024

WD24003A
LOCAL STREET RESURFACING PROGRAM FY 2023-24 SB1 - PAVEMENT REPAIR
April 10, 2024 May 02, 2024 2:00 PM April 25, 2024

WT21010_CML-5008_191
TRANSPORTATION MANAGEMENT CENTER EQUIPMENT UPGRADE
Installation of fiber optics cables and communication equipment in the Stewart Eberhardt Building (SEB) and New City Hall. Install video wall and furniture in the new Traffic Management Center. Upgrade traffic management system, traffic signal controllers, and ethernet switches Citywide.
March 21, 2024 April 11, 2024 2:00 March 21, 2024

WT23019/HSIPSL-5008(204)
REQUEST FOR PROPOSALS (RFP)
WILSON WAY SAFETY LIGHTING PROJECT
Design new street lighting for Wilson Way, which includes design for new conduit to be installed for new street lighting.
March 13, 2024 April 15, 2024 3:00 PM March 13, 2024

P023001
REQUEST FOR PRE-QUALIFICATIONS (RFQ)
ANIMAL SHELTER RENOVATIONS
Contractor Pre-Qualifications to bid on the construction project. Only pre-qualified contractors will be allowed to bid on the project. The project will consist of construction of a new 8,100 square foot building as well as site work.
March 11, 2024 April 17, 2024 3:00 April 04, 2024

WT19013/ATPSB1L-5008(187)
REQUEST FOR PROPOSALS (RFP)
SAFE ROUTE TO SCHOOL SIDEWALK GAP
CLOSURE PROJECT
Provide professional engineering services to complete plans, specifications, and estimates for improving the pedestrian network at five elementary, middle, high schools throughout the City.
March 06, 2024 March 27, 2024 3:00 PM March 06, 2024

WC21021
MIRACLE MILE PARKING LOTS RESURFACING PROJECT
March 01, 2024 March 28, 2024 2:00 PM March 29, 2024

WT19005/ATPCML-5008(189)
*CANCELLED* STOCKTON SAFE ROUTES TO SCHOOL SAFETY AND CONNECTIVITY IMPROVEMENTS *CANCELLED*
Construct bike lanes, missing sidewalk segments, install high visibility crosswalks, flashing beacons, and curb ramps *CANCELLED*

The Project is anticipated to be readvertised no later than next week with an extended bid opening.
February 29, 2024 March 28, 2024 2:00 PM March 25, 2024

WB24040
MORMON SLOUGH RESTORATION AND BEAUTIFICATION
February 27, 2024 March 20, 2024 5:00 PM February 27, 2024

WD22012
OAK PARK SENIOR PARKING LOT RESURFACING PROJECT, PROJECT NO. WD22012
February 23, 2024 March 07, 2024 2:00 PM March 11, 2024

OM-24-069
REQUEST FOR PROPOSALS (RFP)
ON-CALL AUTOMATIC GATE, DOOR & ACCESS CONTROL REPAIR SERVICES
February 21, 2024 March 13, 2024 5:00 PM February 21, 2024

CR18020
REQUEST FOR PROPOSALS (RFP)
AQUATIC FACILITIES RENOVATIONS -
VICTORY PARK POOL
Construction Management and inspection services for the construction of the Victory Park pool, spray ground, restroom/mechanical building, and other related improvements.
February 16, 2024 March 13, 2024 3:00 PM February 16, 2024

E016015-A
STOCKTON CITY HALL PARKING LOT
Construction of a new parking lot on a vacant 2.86-acre lot located at 504 and 666 West Weber Avenue, across the street from the New City Hall Renovations and Relocation project. Work includes asphalt paving, concrete, wrought iron fencing, concrete masonry unit block wall (soundwall), automatic vehicular gates, landscaping, and lighting.
February 05, 2024 March 21, 2024 2:00 PM March 27, 2024

CR18020_
REQUEST FOR PRE-QUALIFICATIONS
AQUATIC FACILITIES RENOVATIONS -
VICTORY PARK POOL
January 31, 2024 February 28, 2024 : January 31, 2024

WT22051/ATPSB1L-5008(200)
REQUEST FOR PROPOSALS (RFP) -
GREATER DOWNTOWN BIKE AND PEDESTRIAN CONNECTIVITY
Provide professional engineering services to prepare the plans, specifications and estimate for the Project.
January 19, 2024 February 20, 2024 3:00 PM February 16, 2024

OM-24-068
REQUEST FOR PROPOSALS (RFP)
Professional Pest Control Services
January 17, 2024 February 07, 2024 5:00 PM January 17, 2024

SEB-24-001
REQUEST FOR QUALIFICATIONS (RFQ)
2024 ON-CALL MATERIAL TESTING SERVICES FOR VARIOUS CITY PROJECTS
The City aims to establish a list of at least three firms to provide material testing services (lab testing, materials testing, specialty inspections and related services) for various City projects during construction on an as-needed basis for a three-year period that can be extended up to two years for a total of five years.
January 04, 2024 January 31, 2024 3:00 PM January 16, 2024 12:00 AM

WT22003E
LOCAL STREET RESURFACING PROGRAM FY 2021-22 SB1 - CAPE SEAL
The project is to resurface residential streets citywide. The project includes rubberized chip seal and slurry seal, removal, and replacement of pavement striping/legends.
January 03, 2024 February 01, 2024 2:00 PM February 05, 2024

WD22053B Readvertised
CITYWIDE SIDEWALK REPAIR
The project includes removing and replacing curb, gutter, and sidewalk damaged by City tree roots at various locations Citywide.
December 28, 2023 January 25, 2024 2:00 PM January 29, 2024

WD24006
STREETLIGHT POLE REPLACEMENT FY 2022-23 SB1
The project will remove and replace existing streetlight poles with brand new galvanized streetlight poles.
December 28, 2023 January 25, 2024 2:00 PM January 29, 2024

WT24038/ATPSB1L-5008(206)
*CANCELLED* REQUEST FOR PROPOSALS (RFP) -
DOWNTOWN STOCKTON WEBER AVENUE BIKE AND PED CONNECTIVITY *CANCELLED*
Preparation of environmental documents for CEQA/NEPA, transportation analysis, and preliminary design for the bike and pedestrian improvements along Weber Avenue from Mormon Slough to Wilson Way. *CANCELLED*
December 22, 2023 January 31, 2024 3:00 PM January 09, 2024

WD22011 CONSTRUCTION
GRUPE PARK PARKING LOT RESURFACING
The project scope includes parking lot resurfacing, removal and replacement of sidewalk, curb and gutter, striping, and installation of ADA-compliant curb ramps. 
December 19, 2023 January 25, 2024 2:00 PM January 29, 2024

CR23005_ReAdvertise
REQUEST FOR PROPOSALS (RFP) -
COMMUNITY CENTER SECURITY CAMERAS 
Provide security camera system installation, monitoring, maintenance repair, inspection, and testing services. These services should be efficient and economical, adhere to industry standards and best practices, and utilize the latest available non-proprietary technology. 
December 08, 2023 January 29, 2024 3:00 PM January 05, 2024

WD23017
LED STREET LIGHTS CONVERSION PHASE 6
The project includes converting approximately 1,500 residential streetlight luminaries from existing high-pressure sodium (HPS) streetlights to light-emitting diode (LED) located along various City streets.
November 02, 2023 November 30, 2023 2:00 PM November 16, 2023

WP13254_WP22013
REQUEST FOR PROPOSALS (RFP)
OAKMORE AND MONTEGO PARK, AND CANNERY PARK NEIGHBORHOOD PARK (7.48 ACRES)
Provide professional design services to prepare plans, specifications, and estimates.
October 26, 2023 November 29, 2023 3:00 PM October 26, 2023

OM-23-016
STREETLIGHT KNOCKDOWN REPAIRS PHASE 7 Repair damaged streetlight poles at various locations throughout the City.
October 19, 2023 November 09, 2023 2:00 PM November 13, 2023

WT18023
REQUEST FOR PROPOSALS (RFP)
FRENCH CAMP ROAD AND MCDOUGALD BOULEVARD TRAFFIC SIGNAL
Provide professional engineering services to prepare plans, specifications, and estimate for the installation of traffic signal at French Camp and McDougald Boulevard
October 19, 2023 November 15, 2023 3:00 PM October 19, 2023

WT23042
REQUEST FOR PROPOSALS (RFP)
VISION ZERO ACTION PLAN
Develop a Vision Zero Plan for the City of Stockton (non-infrastructure).
October 19, 2023 November 15, 2023 3:00 PM October 19, 2023

WD23003C
LOCAL STREET RESURFACING PROGRAM
FY 2022-23 SB1 - SLURRY SEAL
The project is to resurface residential streets Citywide. The project includes slurry sealing, removal, and replacement of pavement striping/legends.
October 10, 2023 November 09, 2023 2:00 PM November 13, 2023

UW23020
REQUEST FOR PROPOSALS (RFP)
SCRIBNER STREET AREA BACKYARD SEWERS
Replacement of 3,400 LF of small diameter (6) Vitrified Clay Pipe sewer lines with a larger size at four locations.
October 04, 2023 November 08, 2023 3:00 PM October 04, 2023

WR21017
MCKINLEY PARK RENOVATION The scope of work includes new picnic shelters, new ball fields, new play area, new restroom, basketball courts, futsal courts, soccer fields, new trees, landscaping and irrigation system modification, path lighting, one parking lot modification, parking lot resurfacing, low impact development improvements to the parking lot, swimming pool and bath house renovations.
October 03, 2023 December 14, 2023 3:00 October 03, 2023

WD24028_ReAdvertise
REQUEST FOR PROPOSAL (RFP)
FOR STREET RESURFACING ON FEDERAL-AID STREETS FY 2023-24
Request for proposal soliciting design services for the Street Resurfacing on Federal-Aid Streets FY 2023-24. The street segments include Hammer Ln (El Dorado St to Thornton Rd), Riverbrook Rd (March Ln East to Driftwood Pl), Brookside Rd (Driftwood Pl to March Ln), and March Ln. (West Ln to Montauban Ave).
October 02, 2023 November 01, 2023 2:00 PM October 26, 2023

WT24037/ATPSB1L-5008(205)
REQUEST FOR PROPOSALS (RFP) - ALPINE PERSHING MENDOCINO BICYCLE-PEDESTRIAN CONNECTIVITY
Preparation of environmental documents for CEQA/NEPA, transportation analysis, preliminary design, and public outreach for the bike and pedestrian improvements along Alpine Avenue, Pershing Avenue, and Mendocino Avenue.
September 27, 2023 November 29, 2023 3:00 September 27, 2023

WB24033
SWENSON PARK GOLF COURSE FENCE REPLACEMENT
Demolition, removal, and disposal of existing chain link fenceand gates along the south and west sides of Swenson Park Golf Course. Construction of a new wrought iron fence and two double swing gates along the south and west sides of Swenson Park Golf Course.
September 07, 2023 November 05, 2023 : September 28, 2023

WD24003D
LOCAL STREET RESURFACING PROGRAM
FY 2023-24 SB1 - MILL AND OVERLAY
The project scope includes milling existing asphalt and overlay with new asphalt layer, installing ADA curb ramps, adjust utility, and removing and reinstall new stripes.
August 21, 2023 October 12, 2023 2:00 PM October 17, 2023

OM-24-012
REQUEST FOR PROPOSALS (RFP)
ON-CALL HVAC EQUIPMENT REPAIR AND MAINTENANCE SERVICES
The City of Stockton Public Works Dept. is seeking proposals to contract with a State-licensed HVAC equipment repair and routine maintenance on-call services.
August 17, 2023 September 08, 2023 5:00 PM August 22, 2023

WD23004C
ADA CURB RAMP INSTALLATION
Installation of ADA-compliant curb ramps at various locations Citywide.
July 31, 2023 August 24, 2023 2:00 PM August 28, 2023

WT22050_ATPL-5008_199
REQUEST FOR PROPOSALS (RFP)
DOWNTOWN EAST-WEST CONNECTION
Provide professional engineering services to prepare plans, specifications, and estimate leading to the construction of bicycle and pedestrian facilities on Fremont Street, Oak Street, and Park Street between Pershing Avenue and Wilson Way in downtown Stockton.
July 27, 2023 August 23, 2023 3:00 PM July 27, 2023

WP22033B_
WEBER POINT EVENTS CENTER SHADE STRUCTURE REHABILITATION - PHASE 2
Phase 2 of the project is to install brand new fabric on the existing Weber Point Events Center Shade Structure. Phase 2 work will also include painting the existing structure and other associated work as per approved plans and specifications.
July 24, 2023 August 31, 2023 2:00 PM August 28, 2023

PUR-23-032
BOSCH PTZ CAMERA AND COMMUNICATION EQUIPMENT INSTALLATION
July 21, 2023 August 31, 2023 2:00 PM September 18, 2023

SEB-23-004
REQUEST FOR PROPOSALS (RFP)
PROFESSIONAL TRAFFIC COUNTS
COLLECTION SERVICES
Obtain professional traffic counts collection services to conduct average daily traffic (ADT) counts, traffic turning movement volume counts, traffic classification volume counts, certified Automatic Traffic Recorder (ATR/Tube), and radar speed survey studies. In addition, the firm shall calculate the traffic index for roadways citywide.
July 20, 2023 August 21, 2023 3:00 PM July 20, 2023

WT16008__
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM
Construct asphalt/concrete speed humps, speed cushions, and speed tables over existing pavement. Install chevrons, diamonds, and pavement marking as necessary. Install advance warning and advisory signs at each location, including bases, posts, rivets, etc.
July 18, 2023 August 10, 2023 2:00 PM August 04, 2023

WD23006
STREETLIGHT POLE REPLACEMENT FY 2022-23 SB1
Remove and replace existing streetlight poles with brand new galvanized streetlight poles.
July 06, 2023 July 27, 2023 2:00 PM July 31, 2023

WT22044_HSIPSL-5008_202
REQUEST FOR PROPOSALS (RFP)
HSIP 10 - Enhanced Pedestrian Safety on Madison Street
Provide professional services to prepare improvement plans, specifications, and cost estimate for installation of high-visibility crosswalks, pavement markings, ADA ramps and rectangular rapid flashing beacons along the intersections of Madison Street with Willow Street, Vine Street, Rose Street, Magnolia Street, Acacia Street, Poplar Street and Flora Street.
June 29, 2023 August 09, 2023 3:00 PM July 24, 2023

SEB-23-005
REQUEST FOR PROPOSALS (RFP)
HAZARDOUS WASTE MANAGEMENT SERVICES
Routine and on-call hazardous waste handling of City-generated waste materials which includes identifying, profiling, packaging, removal, transporting, disposal, and compliance with relevant regulations.
June 28, 2023 July 31, 2023 3:00 PM July 26, 2023

SEB-23-003
REQUEST FOR PROPOSALS (RFP)
FILE ROOM SCANNING AND DIGITAL STORAGE
The project will include boxing and indexing hard copy files that exist in the Public Works File Room on shelving units as well as large format plans stored in hanging files. Boxes will be documented, indexed, and taken to the vendor facility. Files will be scanned into a searchable pdf file, indexed, and filed in a document management medium, to be determined.
June 27, 2023 August 16, 2023 3:00 PM June 27, 2023

WD24028
REQUEST FOR PROPOSALS (RFP)
STREET RESURFACING ON FEDERAL-AID STREETS FY 2023-24
Request for proposal soliciting design services for the Street Resurfacing on Federal-Aid Streets FY 2023-24. The street segments include Hammer Ln (El Dorado St to Thornton Rd), Riverbrook Rd (March Ln East to Driftwood Pl), Brookside Rd (Driftwood Pl to March Ln), and March Ln. (West Ln to Montauban Ave).
June 15, 2023 July 12, 2023 2:00 PM July 10, 2023

OM-23-039
REQUEST FOR PROPOSALS (RFP)
PARKS MAINTENANCE AND JANITORIAL
The City of Stockton Public Works dept is seeking proposals to provide commercial park maintenance and janitorial services within the City.
June 14, 2023 July 12, 2023 2:00 PM July 06, 2023

_WR21017
REQUEST FOR PRE-QUALIFICATION (RFQ)
MCKINLEY PARK RENOVATION
Project is located at 424 East 9th Street. The project will renovate McKinley Park, the swimming pool, and replace the pool house. Please see Attachment A-1 in the Request for Pre-Qualification for a list of proposed improvements. The project excludes any improvement to the existing community center building.
June 13, 2023 July 12, 2023 3:00 PM June 13, 2023

WT24030
REQUEST FOR PROPOSALS (RFP)
DR. MARTIN LUTHER KING JR. BOULEVARD UNDERPASS RECONSTRUCTION
Preparation of preliminary design, California Environmental Quality Act, National Environmental Policy Act documents, public outreach, and identification of right-of-way. Project location is Dr. Martin Luther King Jr. Boulevard from Grant Street to Airport Way.
June 05, 2023 July 21, 2023 3:00 PM June 07, 2023

WD23003D
LOCAL STREET RESURFACING PROGRAM
FY 2022-23 SB1 - MICRO-SURFACING
The project is to resurface various residential streets citywide. The project includes micro-surfacing, removal, and replacement of pavement striping, legends, and pavement repair.
May 11, 2023 June 01, 2023 2:00 PM June 07, 2023

WT22052
MIRACLE MILE RECTANGULAR RAPID FLASHING BEACON IMPROVEMENTS
Install Rectangular Rapid Flashing Beacon and bulbouts at Adams Street and Pacific Avenue. Upgrade light fixtures to current City standards from Castle Street to Harding Way.
May 09, 2023 June 01, 2023 3:00 PM May 09, 2023

WD23003C
LOCAL STREET RESURFACING PROGRAM
FY 2022-23 SB1 - SLURRY SEAL
The project is to resurface residential streets Citywide. The project includes slurry sealing, removal, and replacement of pavement striping/legends.
May 08, 2023 May 25, 2023 2:00 PM May 22, 2023

WT21011_CML-5008_192
ARCH AIRPORT TRAFFIC SYNCHRONIZATION
Install traffic signal on Pock Lane at Arch Airport Road, crosswalks, intersection lighting, lane striping, signs, signal priority, Pan-Tilt-Zoom camera, communication equipment, retiming, and signal synchronization between French Camp Road and Qantas Lane.
May 01, 2023 June 01, 2023 2:00 PM May 01, 2023

WT18008
SOUTH AIRPORT WAY SEPARATED BIKEWAY
Install 3.5 miles of Class IV bike lanes along South Airport Way from Performance Drive to Dr. Martin Luther King Jr. Boulevard. Upgrade guardrail at the northwest corner of the intersection of South Airport Way and Duck Creek. Project includes traffic signal upgrades at 9 locations.
April 27, 2023 May 25, 2023 2:00 PM May 26, 2023

OM-23-111
MISCELLANEOUS EQUIPMENT
April 26, 2023 May 18, 2023 2:00 PM June 06, 2023

CR23018
REQUEST FOR PROPOSALS (RFP)
AQUATICS RENOVATION - OAK PARK
Provide professional design services to prepare plans, specifications, and estimates for the Aquatics Renovation - Oak Park.
April 18, 2023 May 17, 2023 3:00 PM April 18, 2023

_CR26009
REQUEST FOR PROPOSALS (RFP)
OAK PARK SENIOR CENTER RESTROOM RENOVATION
Provide professional design services to prepare plans, specifications, and estimates for the Oak Park Senior Center Restroom Renovation.
April 18, 2023 May 17, 2023 3:00 PM April 18, 2023

WP13207_WP13173_WP13270
REQUEST FOR PROPOSALS (RFP)
FONG PARK PHASE II, EQUINOA PARK PHASE II, AND CANNERY PARK 2.7 ACRE PARK
Provide professional design services to prepare plans, specifications, and estimates for Fong Park Phase II, Equinoa Park Phase II, and Cannery Park 2.7 Acre Park.
April 13, 2023 June 07, 2023 3:00 PM April 13, 2023

WD23003_B
LOCAL STREET RESURFACING PROGRAM
FY 2022-23 SB1 - CRACK SEALING
The project is to crack seal various streets Citywide. The contractor will provide a traffic control and water pollution control plan.
April 12, 2023 May 04, 2023 2:00 PM May 01, 2023

CR23005
REQUEST FOR PROPOSALS (RFP)
COMMUNITY CENTER SECURITY CAMERAS
Provide design and installation services to install indoor and outdoor security cameras at each Community Center. Indoor security cameras will be monitored by Community Center staff with outdoor cameras monitored by Community Center staff, security vendors and the Stockton Police Department.
April 10, 2023 May 12, 2023 3:00 PM May 02, 2023

WD23009
CITY STREET RE-STRIPING FY 2022-23 SB1
The project is to re-stripe worn traffic striping along arterial and collector streets in Stockton and modifications of striping and traffic signs in requested areas.
March 30, 2023 April 20, 2023 2:00 PM April 26, 2023

WD22053B
CITYWIDE SIDEWALK REPAIR
The project includes removing and replacing curb, gutter, and sidewalk damaged by City tree roots at various locations Citywide.
March 29, 2023 April 20, 2023 2:00 PM April 26, 2023

WT23032
REQUEST FOR PROPOSALS (RFP)
MARIPOSA ROAD PRECISE ROAD PLAN
Provide professional engineering services to prepare a precise road plan along Mariposa Road from Martin Luther King Jr. Boulevard/Charter Way to Austin Road.
March 22, 2023 May 03, 2023 3:00 PM March 22, 2023

PUR-23-023
BOSCH PTZ CAMERAS AND COMMUNICATION EQUIPMENT
March 21, 2023 April 20, 2023 2:00 PM May 11, 2023

UW20020
REQUEST FOR PROPOSALS (RFP)
SEWER LARGE DIAMETER LINES REHABILITATION
  Provide professional engineering services to prepare plans, specifications and estimate leading to the rehabilitation of existing large diameter sewer lines and associated manholes at the following locations: Fisher Court between 1-5 and Plymouth Road (24-inch diameter), and in UPRR right-a-way between El Dorado Street and Periman Drive (42-inch diameter).
March 08, 2023 April 25, 2023 3:00 PM March 08, 2023

WD23003A
LOCAL STREET RESURFACING PROGRAM
FY 2022-23 SB1 PAVEMENT REPAIR
The project is to remove and replace existing failed pavement at various locations.
March 07, 2023 March 30, 2023 2:00 PM March 28, 2023

WP22026
REQUEST FOR PROPOSALS (RFP)
PLAYGROUNDS EQUIPMENT REPLACEMENT
The City of Stockton Public Works dept is seeking professional design and installation of park playgrounds at Brooking, Panella, Sandman, and Weber Parks.
March 01, 2023 March 22, 2023 12:00 PM March 16, 2023

SEB-23-002
REQUEST FOR QUALIFICATIONS (RFQ)
GRANT WRITING AND TECHNICAL STUDY ASSISTANCE
Establish a list of at least three (3) firms to provide professional grant writing assistance for grant calls for projects in various programs on an as-needed basis. Grant writing assistance will be needed for various local, state, and federal funding programs. In addition, assistance in the preparation of various technical studies, planning studies, fee related studies, traffic and engineering surveys, and nexus-type analyses are needed.
February 06, 2023 March 15, 2023 3:00 PM March 14, 2023

OM-23-087
REQUEST FOR PROPOSALS (RFP)
Elevator Maintenance and Repair Services The City of Stockton Facilities Maintenance Division is seeking proposals to provide elevator maintenance and repair services.
February 06, 2023 February 23, 2023 3:00 PM February 06, 2023

WT18005_ATPSB1L-5008_194
CALIFORNIA STREET ROAD DIET
Install 1.2 miles of Class IV and 3.8 miles of Class II bike lanes with lane reduction from four-lanes to two auto lanes along a high bike traffic corridor without existing bike facilities. Project will also include signal upgrades and pedestrian pathway improvements.
January 31, 2023 March 23, 2023 2:00 PM January 31, 2023

WT17025_CML-5008_181
PACIFIC AVENUE AND MARCH LANE INTERSECTION MODIFICATIONS
The scope of work includes excavation, demolition, traffic signal modification and relocation, restriping, upgrading the Americans with Disabilities Act compliant curb ramp, and potential tree removal. The City of Stockton has acquired minor Right-of-Way from the adjacent Target Store parking lot and Raising Canes. The purpose of this project is to improve traffic flow from southbound Pacific Avenue to westbound March Lane. The project is needed to reduce traffic congestion and improve air quality.
January 31, 2023 February 23, 2023 2:00 PM February 23, 2023

OM-23-073
REQUEST FOR PROPOSALS (RFP)
ON-CALL PLUMBING MAINTENANCE AND REPAIR SERVICES
The City of Stockton Facilities Maintenance Division is seeking proposals to contract with a State licensed plumbing contractor who shall provide on-call plumbing maintenance and repair services.
January 30, 2023 February 23, 2023 2:00 PM January 30, 2023

UW23007
REQUEST FOR PROPOSALS (RFP)
SOUTH TUXEDO AVENUE SEWER TRUNK REHABILITATION
Rehabilitate the existing sewer trunk line along South Tuxedo Avenue between Kensington Way and Orange Street due to crack and potential consequences of structural failure.
January 23, 2023 March 03, 2023 3:00 PM January 23, 2023

WR21017
REQUEST FOR PROPOSALS (RFP)
MCKINLEY PARK RENOVATION
Construction Management Services for construction of the McKinley Park Renovation project.
January 23, 2023 February 22, 2023 3:00 PM January 23, 2023

WD23003F
TRUCK HAULING SERVICES FOR ASPHALT CONCRETE ASPHALT CONCRETE GRINDING THROUGH DECEMBER 2024
Truck hauling services for asphalt concrete and asphalt concrete grindings on City roadways on an as-needed basis
January 19, 2023 February 09, 2023 2:00 PM January 19, 2023

WD23003G
ASPHALT CONCRETE COLD PLANING (THROUGH DECEMBER 2024)
Provide asphalt concrete cold planing on City Streets on an as-needed basis.
December 01, 2022 December 22, 2022 2:00 PM December 27, 2022

WP22033B
WEBER POINT EVENTS CENTER SHADE STRUCTURE REHABILITATION - PHASE 2
Phase 2 of the project is to install brand new fabric on the existing Weber Point Events Center Shade Structure. Phase 2 work will also include painting the existing structure and other associated work as per approved plans and specifications.
November 30, 2022 February 09, 2023 2:00 PM February 01, 2023

UW16006
2016 SANITARY SEWER REHABILITATION
Replace approximately 2,850 linear feet of existing sewer lines throughout the City of Stockton (Elmwood Avenue, Harding Way, El Monte Street, and Julian Street).
November 30, 2022 January 12, 2023 2:00 PM November 30, 2022

UW20011
2020-21 SANITARY SEWER MAINTENANCE HOLE REHABILITATION
Clean out existing maintenance holes, rehabilitate walls with mortar, and line with an epoxy coating.
November 29, 2022 January 19, 2023 2:00 PM November 29, 2022

WT21013
REQUEST FOR PROPOSALS (RFP)
EIGHT MILE ROAD PRECISE ROAD PLAN
Design of a precise road plan along Eight Mile Road from Interstate 5 to the Highway 99 crossing.
November 23, 2022 December 23, 2022 3:00 PM November 23, 2022

OM-23-057
VARIOUS TRUCKS
November 21, 2022 December 08, 2022 2:00 PM November 21, 2022

WD22053
CITYWIDE TREE REMOVAL AND STUMP GRIND
The project includes tree removal and stump grinding at various locations Citywide.
November 10, 2022 December 01, 2022 2:00 PM December 05, 2022

OM-23-054
HYBRID SEDANS, MIDSIZE SUVS, AND POLICE RATED SUVS
November 09, 2022 December 01, 2022 2:00 PM November 09, 2022

WT19003
INSTALL SIDEWALK AND MEDIAN FENCING ALONG DR. MARTIN LUTHER KING JR. BOULEVARD
Construct pathway with new curb ramps, fencing, concrete stairs, signage, guardrail, curb and gutter.
October 06, 2022 November 03, 2022 2:00 PM November 03, 2022

WE22052
CITYWIDE TREE MAINTENANCE PROJECT
Removal of unhealthy City trees, stump grinding, and pruning of trees along City streets.
October 06, 2022 November 03, 2022 2:00 PM November 07, 2022

WT15026
LIGHTED CROSSWALK UPGRADES
Upgrade existing in-pavement lighted crosswalk systems on El Dorado Street.
September 30, 2022 October 27, 2022 2:00 PM September 30, 2022

WD22016
DOWNTOWN DECORATIVE STREETLIGHT LED CONVERSION
Remove and replace existing King Ferronite Light Fixtures with Contractor(s) furnished brand new Stockton LED Fixtures at various locations within the City.
September 22, 2022 October 13, 2022 2:00 PM October 14, 2022

WT22039
REQUEST FOR PROPOSALS (RFP)
CITYWIDE BRIDGE SLOPE PROTECTION
Provide professional design services to the City. The Consultant shall provide preliminary and final engineering services leading to the completion of plans, specifications, and estimates to construct the planned improvements.
September 19, 2022 October 19, 2022 3:00 PM September 19, 2022

WD23003
PURCHASE OF HOT MIX ASPHALT
Provides the City of Stockton purchase of hot mix asphalt in incremental quantities through a multi-year supply contract.
September 19, 2022 October 13, 2022 2:00 PM October 14, 2022

WT19002_HSIPL-5008_184
INSTALL LEFT-TURN LANES AT AIRPORT WAY AND HAZELTON AVENUE
Installation of left-turn lanes to the intersection of Airport Way/Hazelton Avenue, combined with associated signal modification and upgrades. In addition, add sidewalk to close gaps and improve access for pedestrians on Airport Way along with curb and gutter improvements. Additionally, wheelchair ramps improvements would be installed at corners of the intersections of the surrounding street.
September 15, 2022 October 13, 2022 2:00 PM October 04, 2022

WT19001_HSIPL-5008_183
INSTALL LEFT-TURN SIGNALS AT THREE INTERSECTIONS
Install protected left-turn signals at three intersections. March Lane and McGaw Street, El Dorado Street and Benjamin Holt Drive, and El Dorado Street and Robinhood Drive.
September 08, 2022 October 13, 2022 2:00 PM October 13, 2022

OM-23-022
REQUEST FOR PROPOSALS (RFP)
POLICE DEPARTMENT AND CITY VEHICLE UP-FITTING
Request for proposals from qualified vehicle up-fitters for up-fitting of Police and City Vehicles.
September 07, 2022 September 28, 2022 2:00 PM September 07, 2022

_WT15022
REQUEST FOR PROPOSALS (RFP)
PROFESSIONAL SUPPORT SERVICES FOR THE TRANSYNC TRAFFIC SIGNAL TIMING EVALUATION TOOL
Provide a two-year, with optional additional two-years, licenses, support, training for TransSync traffic signal timing evaluation took, and provide equipment for use in City vehicles.
July 26, 2022 August 17, 2022 3:00 PM July 26, 2022

WT22008_STPLR-7500_289
REQUEST FOR PROPOSALS (RFP)
WEST LANE QUEUE CUTTER
Provide professional design services to prepare plans, specifications, and estimates for the West Lane Queue Cutter.
July 25, 2022 August 25, 2022 3:00 PM August 10, 2022

WD22006
STREETLIGHT POLE REPLACEMENT FY 2021-22 SB1
Remove and replace existing streetlight poles with brand new galvanized streetlight poles
June 30, 2022 July 21, 2022 2:00 PM July 22, 2022

WD22012
REQUEST FOR PROPOSALS (RFP)
PROFESSIONAL SERVICES FOR OAK PARK SENIOR CENTER PARKING LOT RESURFACING
Provide professional design services to prepare plans, specifications, and estimates for the Oak Park Senior Center parking Lot Resurfacing.
June 29, 2022 July 20, 2022 2:00 PM June 29, 2022

WD22011
REQUEST FOR PROPOSALS (RFP)
PROFESSIONAL SERVICES FOR GRUPE PARK PARKING LOT RESURFACING
Provide professional design services to prepare plans, specifications, and estimates for the Grupe Park Parking Lot Resurfacing project.
June 07, 2022 June 29, 2022 3:00 PM June 21, 2022

WD22009
CITY STREET RE-STRIPING FY 2021-22 SB1
The project is to re-stripe worn traffic striping along arterial and collector streets in Stockton.
May 19, 2022 June 09, 2022 2:00 PM June 10, 2022

WD22004C
ADA Curb Ramp Installation
Installation of ADA-compliant curb ramps at various locations citywide.
May 10, 2022 June 09, 2022 2:00 PM June 10, 2022

WT17021_CML-5008_176
LINCOLN STREET AND EIGHTH STREET ROUNDABOUT
Construct a roundabout at the intersection of Lincoln Street and Eighth Street. Project also includes upgrading sidewalk corners to American Disabilities Act standards and installing interconnected Point-Tilt-Zoom camera, street lighting, rectangular rapid beacons, signing, and striping
April 26, 2022 May 26, 2022 2:00 PM April 26, 2022

WD22017
SIDEWALK REPLACEMENT PROJECT
Remove and replace the existing sidewalk, curb, gutter, curb ramp, and bridge-type driveway.
April 21, 2022 May 19, 2022 2:00 PM May 23, 2022

PUR-22-009
PUBLIC WIFI PILOT PROGRAM
April 19, 2022 June 30, 2022 2:00 PM May 09, 2022

WT16008_
REQUEST FOR PROPOSALS (RFP)
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM - TRAFFIC CIRCLES AND BULBOUT
Provide professional engineering services to prepare plans, specifications and estimate for the Neighborhood Traffic Management Program project to design a traffic circle at the intersection of Commerce Street and Willow Street and a bulbout at the northwest corner of Myrtle Street and Filbert Street.
April 07, 2022 May 04, 2022 3:00 PM April 07, 2022

OM-22-051
EMERGENCY ON-CALL TREE SERVICES
On-Call Emergency tree services, including removal and disposal, throughout the City of Stockton.
April 07, 2022 April 28, 2022 2:00 PM April 05, 2022

_WT19005_
REQUEST FOR PROPOSALS (RFP)
STOCKTON SAFE ROUTES TO SCHOOL SAFETY AND CONNECTIVITY IMPROVEMENTS
Provide professional engineering services to prepare the plans, specifications and estimate. The Consultant must be familiar with the Caltrans Local Assistance Programs Guidelines (LAPG) and Local Assistance Procedures Manual (LAPM). The proposed project shall make all necessary improvements to reduce pedestrian and bicyclist related collision at and near the six schools.
March 31, 2022 May 04, 2022 3:00 PM April 05, 2022

WT17026_CML_5008_180
REAL-TIME TRAFFIC FLOW MONITORING
Install 35 Bluetooth real-time traffic flow monitoring devices along arterials throughout the city.
March 31, 2022 April 28, 2022 2:00 PM May 02, 2022

WT22046
REQUEST FOR PROPOSALS (RFP)
LEFT-TURN POCKETS
Professional engineering services to prepare the plans, specifications and estimate, and signal design for the installation of left-turn pockets, upgrade signals, and high friction surface treatment at the intersection of Harding Way and Lincoln Street and intersection of Harding Way and Pacific Avenue/Madison Street.
March 18, 2022 April 26, 2022 3:00 PM March 18, 2022

OM-22-028
STREETLIGHT KNOCKDOWNS PHASE 6 REPAIR PROJECT
Repair damaged streetlight poles at various locations throughout the City.
March 14, 2022 March 31, 2022 2:00 PM April 01, 2022

WC21014
SMITH CANAL FOOTBRIDGE FENCING MAINTENANCE PLAN
The project includes replacing existing fencing along the Smith Canal footbridge and near the North bank.
March 10, 2022 March 31, 2022 2:00 PM April 04, 2022

WT18009
SAFE ROUTES TO SCHOOL PRIORITY SAFETY
This project will construct crossing improvements, including new raised medians, pedestrian refuge islands at crossings, road diets, curb and gutter, curb ramps, high visibility crosswalks, and signing and striping to improve safety and accessibility for pedestrians at ten locations and six schools throughout Stockton.
March 07, 2022 April 14, 2022 2:00 PM April 20, 2022

_WT16008
NEIGHBORHOOD TRAFFIC MANAGEMENT PROGRAM - TRAFFIC CIRCLES
Install traffic circles, upgrade curb ramps to current American Disabilities Act standards, at the intersections of Harvey Avenue/Wait Avenue and El Camino Avenue/El Cajon Avenue.
March 07, 2022 March 31, 2022 2:00 PM March 07, 2022

WP22041
REQUEST FOR PROPOSALS (RFP)
COLUMBUS PARK RENOVATIONS
Provide professional engineering services to prepare plans, specifications, and an estimate of probable construction cost.
February 24, 2022 March 23, 2022 3:00 PM March 18, 2022

OM-22-040
REQUEST FOR PROPOSALS (RFP)
ROOF MAINTENANCE AND ON-CALL LEAK RESPONSE
Annual roof inspection and maintenance, roof repair services, and on-call roof leak response for various City owned buildings. This Request for Proposals will result in a five (5) year services contract.
February 24, 2022 March 17, 2022 3:00 PM February 24, 2022

WT22047
REQUEST FOR PROPOSALS (RFP)
NORTH PERSHING AVENUE SAFETY ENHANCEMENTS
Provide professional engineering services to prepare the plans, specifications and estimate leading to the construction of adding a protected left turn phasing, lengthen an existing turn pocket, and upgrade traffic signal equipment at the intersections of N. Pershing Avenue / Country Club Boulevard N. Pershing Avenue / Rosemarie Lane.
February 18, 2022 March 31, 2022 3:00 PM March 29, 2022

WT22048
REQUEST FOR PROPOSALS (RFP)
SOUTH STOCKTON PEDESTRIAN HAWK IMPROVEMENTS
Provide professional engineering services to prepare plans, specifications and estimate leading to the construction of eight (8) locations to install high-intensity activated crosswalk (HAWK) beacons, intersection lighting, high visibility crosswalks, and frontage improvements.
February 18, 2022 March 18, 2022 3:00 PM February 18, 2022

_WD22004
SIDEWALK, CURB, AND GUTTER REPAIRS PROGRAM FY 21-22
SB1 The project includes removal and replacement of curb, gutter and sidewalk damaged by City tree roots at various locations citywide.
February 17, 2022 March 10, 2022 2:00 PM March 14, 2022

OM-22-030
REQUEST FOR PROPOSALS (RFP)
VAN BUSKIRK COMMUNITY CENTER GYM FLOOR INSTALLATION
Qualified flooring installation company to install new maple wood gymnasium floor at the Van Buskirk Community Center.
February 10, 2022 March 03, 2022 3:00 PM February 24, 2022

WT17002_CML-5008_175
BEAR CREEK AND PIXLEY SLOUGH BICYCLE AND PEDESTRIAN PATH
Project will install and upgrade various bicycle facilities along Thornton Road, Eight Mile Road, and Lower Sacramento Road. Project will also install Rapid Flashing Beacons at various intersections and a Hawk Signal at Thornton Road, including pavement widening, signage and striping, traffic control, and other work necessary to complete the project.
February 08, 2022 March 17, 2022 2:00 PM February 08, 2022

UW22003
REQUEST FOR PROPOSALS (RFP)
PERSHING AVENUE SEWER TRUNK REHABILITATION
Provide professional engineering services to prepare plans, specifications and estimate (PSE) leading to the upsize of the existing 36 sewer trunk main on Pershing Avenue between Lincoln Road and Meadow Avenue to a 42 sewer trunk main
February 07, 2022 February 28, 2022 3:00 PM February 04, 2022

P015035-A
POLICE HEADQUARTERS WOMEN'S LOCKER ROOM REMODEL
Tenant improvements, American Disabilities Act upgrades to the women's locker room, three restrooms, and two storage rooms located at 22 East Market Street
February 04, 2022 March 03, 2022 2:00 PM February 04, 2022

OM-22-022_
SECOND REQUEST FOR PROPOSAL FOR MIXED DEBRIS DISPOSAL
Provide disposal services for all debris, litter, and illegally dumped items picked up throughout the City of Stockton.
February 02, 2022 February 23, 2022 2:00 PM February 02, 2022

WP22033
WEBER POINT EVENTS CENTER SHADE STRUCTURE REHABILITATION - PHASE 1
The Phase 1 of the project is to stabilize the existing Weber Point Events Center Shade Structure. Phase 1 work also includes demolition of the existing fabric from the shade structure includes other associated work as per the approved plans.
January 27, 2022 February 17, 2022 2:00 PM February 23, 2022

WT19009
REQUEST FOR PROPOSALS (RFP)
AIRPORT WAY BRIDGE OVER MORMON SLOUGH FIRE REPAIR
Provide professional engineering services to prepare plans, specifications and estimate leading to the repair of the Airport Way Bridge over Mormon Slough damaged by fire.
January 25, 2022 February 23, 2022 3:00 PM February 10, 2022

WT22053
REQUEST FOR PROPOSALS (RFP)
CHANNEL STREET IMPROVEMENTS
Provide professional engineering services leading to the completion of plans, specifications, and estimate for installing landscaping, sidewalks, bicycle lanes, curb and gutter, ADA-compliant ramps, and bulb -outs.
January 13, 2022 February 10, 2022 3:00 PM February 04, 2022

WT19004_HSIPL-5008_185
RECTANGULAR RAPID FLASHING BEACON INSTALLATION
Project will install flashing beacons, crosswalks, and American Disabilities Act (ADA) curb ramps at four locations to improve pedestrian crossings.
January 13, 2022 February 10, 2022 2:00 PM January 13, 2022 12:00 AM

OM-22-022
REQUEST FOR PROPOSAL (RFP)
FOR MIXED DEBRIS DISPOSAL
Provide disposal services for all debris, litter, and illegally dumped items picked up throughout the City of Stockton.
January 07, 2022 January 26, 2022 3:00 PM January 21, 2022

OM-22-021
REQUEST FOR PROPOSAL (RFP)
FOR DEBRIS REMOVAL AND PICKUP
Provide services for removal and pickup of all debris, litter and illegally dumped items throughout the City of Stockton.
January 07, 2022 January 26, 2022 3:00 PM January 07, 2022

UW18029
SIERRA NEVADA STREET SANITARY SEWER REHABLITIATION
Rehabilitate approximately 1,552 linear feet of 36-inch sewer line along Sierra Nevada Street between Hazelton Avenue and Worth Street, and along Hazelton Avenue between Sierra Nevada Street and Wilson Way.
December 27, 2021 February 10, 2022 2:00 PM February 07, 2022

OM-22-013
REQUEST FOR PROPOSALS (RFP)
HOMELESS EMPLOYMENT LITTER PROGRAM
Requesting proposals from qualified proposers to provide management and operation of the Homeless Employment Litter Program in accordance with the terms, conditions, and specifications contained in Scope of Work.
December 22, 2021 February 09, 2022 3:00 PM December 22, 2021

WARP503
REQUEST FOR PROPOSALS (RFP)
CITY OF STOCKTON FIBER OPTIC MASTER PLAN EXPANSION
Provide professional engineering services to prepare a fiber optic master plan and plans, specifications, and estimate (PSE) for the Fiber Optic Master Plan and Expansion.
December 20, 2021 January 21, 2022 3:00 PM January 10, 2022

F022001
FIRE STATION 2 COMMUNICATION CENTER UNINTERRUPTIBLE POWER SUPPLY REPLACEMENT
Replace uninterruptible power supply in the Emergency Dispatch Center located in Fire Station 2
December 16, 2021 January 27, 2022 2:00 PM January 27, 2022

WT19018
ALEXANDRIA AND FIVE MILE SLOUGH CULVERT REPLACEMENT
Installation of a concrete box culvert in Five Mile Slough at Alexandria Place. The project will also install rock slope protection adjacent to the concrete box culvert.
December 16, 2021 January 20, 2022 2:00 PM January 20, 2022

__E016015__
NEW CITY HALL RENOVATIONS AND RELOCATION
Only Pre-Qualified Contractors are allowed to submit a construction bid for this project.
Project is located at 501 and 509 Weber Avenue. Tenant improvements to the existing two buildings. The buildings will be the new Stockton City Hall.
December 15, 2021 March 03, 2022 2:00 PM March 04, 2022

OM-22-005
REQUEST FOR PROPOSALS (RFP)
FOR CUSTODIAL SERVICES
Provide janitorial services at 23 owned or occupied City facilities/locations for a multi-year and multi-departmental contract for services.
December 15, 2021 January 20, 2022 3:00 PM January 12, 2022

CR18020
REQUEST FOR PROPOSALS (RFP)
AQUATIC FACILITIES RENOVATION REPLACEMENT PROGRAM - VICTORY PARK POOL
Professional engineering/architectural services to prepare plans, specifications, and estimate (PSE) for the replacement of existing Victory Park pool and bathhouse / mechanical building.
November 23, 2021 January 13, 2022 3:00 PM December 22, 2021

WT16008
NEIGHBORHOOD TRAFFIC CALMING PROGRAM
Construct asphalt concrete speed humps, speed cushions, and speed tables over existing pavement. Install chevrons, diamonds, and pavement markings as necessary. Install advance warning and advisory signs at each location, including bases, posts, rivets, etc. It is estimated that speed humps/cushions/tables to be installed at thirty-eight (38) locations by contractor in combined phases.
November 17, 2021 December 16, 2021 2:00 PM November 17, 2021

WT15016_CML-5008_149
BUS RAPID TRANSIT (BRT) PHASE V
Install Transit Priority Signals at various locations along the route. The project will also install signage, striping, curb gutter, sidewalk, and American Disabilities Act compliant curb ramps and other traffic signal equipment.
November 17, 2021 December 16, 2021 2:00 PM December 16, 2021

Last Update : 11/22/2023, 9:51:19 AM