City logo and web banner

Public_Works / General Bid Procurement

Project Number: PW1735_
General Information
Due Date:September 12, 2019
Opening Time:2 pm
Published Date:August 15, 2019
Last Updated:August 21, 2019
Bid Orientation:August 28, 2019, at 9 am. 235 N. Center St. Stockton, CA
Description:WEBER POINT EVENTS CENTER FOUNTAIN RENOVATION
The City is soliciting bids for work on the Weber Point Events Center Filter Renovation
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerBrad Mettler(209) 937-7261Brad.Mettler@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (8-21-19)
Notice:
Document:Notice Inviting Bids
Specifications:
Document:WEC Fountain Specifications
Document:WEC Fountain Plans
Document:Bid Forms

 


 

Project Number: PW1805
General Information
Due Date:September 11, 2019
Opening Time:3:00 p.m.
Published Date:August 13, 2019
Last Updated:August 13, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - CALIFORNIA STREET ROAD DIET - PHASE 1
The proposed project proposes to construct a mix of Class II and IV bike facilities by reducing an existing four-lane arterial to two auto lanes and a center left-turn lane along California Street between Alpine and Eighth Street, allowing for buffered and separated bicycle lanes and on-street parking where applicable. This project will also include bike route signage along Eighth Street from California Street to El Dorado Street. There will also be associated signal modifications, improvements to traffic control devices, railroad crossing approach, street lighting, curb, gutter, and sidewalk, ADA improvements at curb ramps, including pavement improvement treatment/repairs within proposed bicycle facilities.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492karla.cervantes@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-9412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1914
General Information
Due Date:September 06, 2019
Opening Time:5 pm
Published Date:August 14, 2019
Last Updated:August 20, 2019
Bid Orientation:N/A
Description:PAVEMENT PRELIMINARY SITE INVESTIGATION AND MATERIAL TESTING
The City of Stockton is soliciting proposals from AASHTO Qualified laboratories under AMRL Re:source program or Caltrans certified material testing firms to conduct preliminary site investigation on existing roads.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Insurance Requirementslink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 937-8346Omar.Al-Hindi@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions - Answers - Clarifications (8-20-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Plans, Attachments & Agendas:
Document:Instructions to Proposers
Document:Northern CA Prevailing Wages (8-14-19)

 


 

Project Number: PW1811
General Information
Due Date:September 06, 2019
Opening Time:3:00 p.m.
Published Date:August 01, 2019
Last Updated:August 01, 2019
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - CENTRAL STOCKTON ROAD DIET AND STRIPING CONNECTIONS
Provide professional engineering services leading to the completion of studies, plans, specifications, and estimate for lane reduction to install bicycle facilities onto Monte Diablo Avenue/Acacia Street, Madison Street, and Fremont Street.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSeng Lo(209) 937-8389seng.lo@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-19-045
General Information
Due Date:August 28, 2019
Opening Time:2 pm
Published Date:August 15, 2019
Last Updated:August 12, 2019
Bid Orientation:N/A
Description:WESTON RANCH PRECAST FENCE SYSTEM REPAIRS
Firms are invited to bid for the repair of damage to the precast wall system at six locations in the Weston Ranch Subdivision.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Notice Inviting Bids
Specifications:
Document:Special Provisions
Document:Attachment A - Maps and Photos
Document:Bid Schedule
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Northern CA Prevailing Wages
Document:SJ County Prevailing Wages

 


 

Project Number: PW1725_CML-5008_181
General Information
Due Date:August 22, 2019
Opening Time:3:00 p.m.
Published Date:July 22, 2019
Last Updated:August 09, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - PACIFIC AVENUE AND MARCH LANE INTERSECTION MODIFICATIONS
Provide professional consulting services to prepare plans, specifications, and estimate leading to modifications of the intersection of Pacific Avenue and March Lane
Award Date:N/A
Related Links:
Description:URL:
Insurancelink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions & Answers (7-25-19)
Document:Letter of Clarification No. 1 (8-9-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: M13016
General Information
Due Date:August 22, 2019
Opening Time:2:00 p.m.
Published Date:July 18, 2019
Last Updated:August 15, 2019
Bid Orientation:Non-Mandatory Job Walk: Wednesday, August 14, 2019 at 11:00 a.m.. Job walk will begin at the location of Well No. 4 - 110 Segovia Lane, then move to the location of Well No. 7 - 8335 Galloway Drive
Description:ABANDONMENT OF WATER WELLS 4 AND 7
The project consists of demolition and abandonment of wells, well equipment, and installation of a new gate. Location of construction is at Cruz Park, 110 Segovia Lane and 8335 Galloway Drive
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (7-23-19)
Document:Job Walk Sign-in Sheet (8-14-19)
Specifications:
Document:Bid Forms
Document:Specifications
Plans, Attachments & Agendas:UPDATED
Document:Instructions to Bidders
Document:Vicinity Map
Document:Plans
Document:State Wage Rates (7-18-19)
Document:Well 4 As-Builts
Document:Well 7 As-Builts

 


 

Project Number: PW1613
General Information
Due Date:August 15, 2019
Opening Time:2:00 p.m.
Published Date:July 26, 2019
Last Updated:August 15, 2019
Bid Orientation:n/a
Description:WILSON WAY CORRIDOR IMPROVEMENTS PROJECT
Undergrounding of overhead streetlight electric feed, installation of new street lights, relocation of existing street lights currently on wooden poles, some sidewalk repair, tree well repair, and planting of new trees.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:
Document:Letter of Clarification No. 1 (8-12-19)
Submittals:UPDATED
Document:Bid Abstract (8-15-19)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (8/15/19)
Specifications:
Document:Specifications
Document:Bid Forms (UPDATED PER LOC NO. 1)
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (7-26-19)

 


 

Project Number: PW1812_ATPLNI-5008_182
General Information
Due Date:August 13, 2019
Opening Time:3:00 p.m.
Published Date:July 23, 2019
Last Updated:August 07, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - ACTIVE SAFE ROUTES TO SCHOOL TRAIN THE TRAINER
Seeking qualified consulting firms to provide education and outreach consulting services.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerHerminia Rodriguez(209) 937-5136Herminia.Rodriguez@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions & Answers (8-7-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: SJAFCA-RFP-19-01
General Information
Due Date:August 09, 2019
Opening Time:4:00 pm
Published Date:July 24, 2019
Last Updated:July 24, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MOSSDALE TRACT AREA OVERLAY ASSESSMENT DISTRICT
SJAFCA seeks Request for Proposals for consulting engineers to prepare an Engineer's Report to support the formation of the proposed Mossdale Tract Area Overlay Assessment District to fund ULOP Flood Protection Improvements and, if required, supplemental Operations and Maintenance as requested within the attached Preliminary Scope of Work (Exhibit A)
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerMarlo Duncan(209) 937-7900marlo.duncan@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposals
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1904_HSIPL-50008_185
General Information
Due Date:August 07, 2019
Opening Time:3:00 p.m.
Published Date:July 12, 2019
Last Updated:August 01, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - RECTANGULAR RAPID FLASHING BEACON INSTALLATION PROJECT
Provide professional engineering services leading to the completion of plans, specifications, and estimate for the installation of solar powered flashing beacons, high visibility crosswalks, signage, and frontage improvements to include curb gutters, sidewalks, and curb ramps.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSeng Lo(209) 937-9389seng.lo@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226analissa.nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (8-1-2019)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holder's List (7-30-19)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1902
General Information
Due Date:July 29, 2019
Opening Time:3:00 p.m.
Published Date:June 28, 2019
Last Updated:June 28, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - INSTALL LEFT-TURN LANES AT AIRPORT WAY AND HAZELTON AVENUE
Add designated left-turn lanes and signal phasing to the intersection of Airport Way and Hazelton Avenue. Combined with associated signal modifications and upgrades. Add sidewalk to close gaps and improve access for pedestrians on Airport Way along with other improvements.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerGaurav Regmi(209) 937-8241gaurav.regmi@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (Updated 7-17-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1624_
General Information
Due Date:July 25, 2019
Opening Time:3:00 p.m.
Published Date:July 03, 2019
Last Updated:July 03, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MCNAIR SOCCER COMPLEX PROJECT (PHASE 2)
Seeking proposals from qualified firms to provide professional engineering services to prepare plans, specifications, and a cost estimate.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1806
General Information
Due Date:July 11, 2019
Opening Time:3:00 p.m.
Published Date:May 31, 2019
Last Updated:June 20, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MAIN STREET COMPLETE STREETS PROJECT
Design of a precise road plan along Main Street from Aurora Street to the Highway 99 crossing
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (6-20-2019)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1535_
General Information
Due Date:July 11, 2019
Opening Time:2:00 p.m.
Published Date:June 04, 2019
Last Updated:June 25, 2019
Bid Orientation:MANDATORY JOB WALK: Tuesday, June 11, 2019 at 10 a.m. OR Tuesday, June 18, 2019, 1:30 p.m., Police Department 22. E. Market St., Stockton, CA 95202. Contractors are required to attend one of the two job walks.
Description:POLICE HEADQUARTERS BASEMENT REMODEL
Remodel of the Police Department headquarters basement. Project includes hazardous material abatement, new showers and restrooms, new locker rooms, new ceilings, new lighting, fire sprinkler system modifications as well as early notifications, and relocation of lockers during construction
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055Joshua.Lewis@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Job Walk (6-11-2019)
Document:Job Walk (6-18-2019)
Document:Plan Holder's List (6-19-2019)
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:Hazardous Material Inspection Report
Document:State Wage Rates (6-4-2019)

 


 

Project Number: SEB-20-001
General Information
Due Date:June 28, 2019
Opening Time:3:00 p.m.
Published Date:June 17, 2019
Last Updated:June 18, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - GRANT WRITING ASSISTANCE FOR THE CONGESTION MITIGATION AND AIR QUALITY (CMAQ) - To provide professional grant writing assistance for the 2019 Congestion Mitigation and Air Quailty (CMAQ) call for projects.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Contacts:
Role:Name:Phone:Email:
Project ManagerWes Johnson(209) 937-8088Wes.Johnson@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (6-18-2019)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1810
General Information
Due Date:June 20, 2019
Opening Time:3:00 p.m.
Published Date:March 05, 2019
Last Updated:June 12, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - SAFE ROUTES TO SCHOOL SIDEWALK NETWORK COMPLETION PROJECT
Work consists of designing sidewalk gap closure projects at three school locations, Van Buren Elementary, John Adams Elementary, and Great Valley Elementary
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holder's List (4-9-2019)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1815-Phase-1
General Information
Due Date:June 13, 2019
Opening Time:2 pm
Published Date:May 23, 2019
Last Updated:June 17, 2019
Bid Orientation:N/A
Description:PW1815 SIDEWALK, CURB, AND GUTTER REPAIR PROGRAM FY 2018-19 SB1
The project includes removal and replacement of curb, gutter and sidewalk damaged by City tree roots, and installation of ADA curb-ramps at various locations citywide.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerThinh Phan(209) 937-8885Thinh.Phan@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:
Document:Questions - Answers - Clarifications
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holders List

 


 

Project Number: PW1510
General Information
Due Date:June 12, 2019
Opening Time:3:00 p.m.
Published Date:May 16, 2019
Last Updated:May 16, 2019
Bid Orientation:Non-Mandatory Site Visit: Thursday, May 23, 2019, 10:00 a.m., Stockton Soccer Complex
Description:REQUEST FOR PROPOSALS (RFP) - STOCKTON SOCCER COMPLEX UPGRADES AND MAINTENANCE PROGRAM
Improvements include: expanding the existing parking lot, installing additional restrooms, and installing additional field stadium lighting.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055joshua.lewis@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (Updated 6-6-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Job Walk (5-29-19)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1815
General Information
Due Date:May 31, 2019
Opening Time:5 pm
Published Date:May 08, 2019
Last Updated:May 08, 2019
Bid Orientation:N/A
Description:SIDEWALK, CURB, AND GUTTER REPAIR PROGRAM FY2018/19 SB1 (CONCRETE SAW-CUTTING AND SHAVING SERVICES ON-CALL CONTRACT)
The City of Stockton is soliciting for proposals for work saw -cutting and shaving sidewalk displacements to eliminate tripping hazards. Only sidewalks that are displaced between 0 and 2 can be saw -cut and shaved.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 937-8346Omar.Al-Hindi@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: PW1736
General Information
Due Date:May 28, 2019
Opening Time:3 pm
Published Date:May 06, 2019
Last Updated:May 21, 2019
Bid Orientation:May 14, 2019. 10 am
Description:VICTORY PARK IRRIGATION WELL PROJECT
The City of Stockton is issuing this Request for Proposal to Respondents interested in providing construction services at Victory Park for a new irrigation well and pump.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMitchel Jackson(209) 937-8283Mitchel.Jackson@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions - Answers - Clarifications
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List
Specifications:
Document:Request for Proposal

 


 

Project Number: M19005
General Information
Due Date:May 16, 2019
Opening Time:2:00 p.m.
Published Date:April 19, 2019
Last Updated:April 19, 2019
Bid Orientation:n/a
Description:2018-19 SANITARY SEWER MAINTENANCE HOLE REHABILITATION
Rehabilitation of sanitary sewer manholes at various locations throughout the City. Rehabilitation work consists of sewer maintenance hole cleaning, liner or coating removal, maintenance hole wall mortar repair, and rehabilitation of maintenance holes. Additional items included in the project include project mobilization, traffic control, and water pollution control.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSeng Lo(209) 937-8389seng.lo@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (Updated 5-13-19)
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List (Updated 5-14-19)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Attachment A - Vicinity Map
Document:State Wage Rates (4-19-19)

 


 

Project Number: PW1608
General Information
Due Date:May 09, 2019
Opening Time:2:00 p.m.
Published Date:April 09, 2019
Last Updated:April 09, 2019
Bid Orientation:N/A
Description:NEIGHBORHOOD TRAFFIC CALMING PROGRAM
Construct asphalt/concrete speed humps, speed cushions, speed tables and dikes over existing pavement. Install City furnished thermoplastic striping, chevrons, diamonds, pavement markings, and green bike lanes as necessary. Install street planters or other similar devices as necessary. Install City furnished advance warning and advisory signs at each location, including bases, posts, rivets, etc. Install Rectangular Rapid Flashing Beacon. Project is a contract for construction in multiple phases. It is estimated that speed humps/cushions/tables may be installed at 200 to 250 locations by contractor in combined phases.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerHerminia Rodriguez(209) 937-5136herminia.rodriguez@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 4-18-19)
Specifications:
Document:Specifications
Document:Bid Forms

 


 

Project Number: M18028
General Information
Due Date:April 25, 2019
Opening Time:3:00 p.m.
Published Date:March 26, 2019
Last Updated:March 26, 2019
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - WORTH STREET SANITARY SEWER LINE REHABILITATION
Provide Professional Services for the rehabilitation of approximately 7,920 feet of existing 36-inch diameter of sanitary sewer line along Worth Street and Sierra Nevada Street.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492karla.cervantes@stocktonca.gov
Plan Holders ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: SEB-19-006
General Information
Due Date:April 10, 2019
Opening Time:3:00 p.m.
Published Date:March 14, 2019
Last Updated:March 14, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - PROFESSIONAL TRAFFIC COUNTS COLLECTION SERVICES
Traffic volume data collection at pre-determined list of locations within the City limits.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 397-8243parviz.chitsazan@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (3-25-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: SEB-19-005
General Information
Due Date:April 04, 2019
Opening Time:3:00 p.m.
Published Date:March 13, 2019
Last Updated:April 01, 2019
Bid Orientation:n/a
Description:REQUEST FOR QUALIFICATIONS (RFQ) - 2019 ON-CALL CONSTRUCTION MANAGEMENT SERVICES
Seeking qualified consultant to provide Construction Management for various City of Stockton projects including: buildings and facilities, utility install and rehabs, and recreation facility improvements. Could also include construction estimates and/or constructibility reviews
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project Manager Joshua Lewis(209) 937-8055Joshua.Lewis@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (3-27-2019)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (4-1-19)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1320__
General Information
Due Date:April 04, 2019
Opening Time:2:00 p.m.
Published Date:March 04, 2019
Last Updated:April 04, 2019
Bid Orientation:Non-Mandatory Job Walk: Tuesday, March 19, 2019, 9 a.m., Corporation Yard, 1465 S. Lincoln Street, Stockton, CA 95206
Description:ROOF REPLACEMENT AND HVAC UPGRADES - CENTRAL STORES
HVAC units and roofing replacement on the Central Stores Building at the City of Stockton's Corporation Yard
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055Joshua.Lewis@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract (4-4-2019)
Job Walk & Plan Holder's List:
Document:Job Walk (3-19-2019)
Document:Plan Holder's List (4-3-2019)
Specifications:
Document:Bid Forms
Document:Specifications
Document:Hazardous Materials Report
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (3-4-2019)

 


 

Project Number: SJAFCA
General Information
Due Date:March 28, 2019
Opening Time:4:00 p.m.
Published Date:February 26, 2019
Last Updated:February 26, 2019
Bid Orientation:NA
Description:REQUEST FOR QUALIFICATIONS
The San Joaquin Area Flood Control Agency (SJAFCA) is Requesting Statement of Qualifications and Budget Proposals for Construction Management Services for the Smith Canal Gate project.
SEE SJAFCA WEBPAGE FOR INFORMATION
Award Date:N/A
Related Links:
Description:URL:
SJAFCA Webpagelink
Contacts:
Role:Name:Phone:Email:
Senior EngineerJuan Neira(209) 937-8113juan.neira@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Noticetals
There are no Notice documents to view.
Specifications:
There are no Specification documents to view.
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: PW1620_
General Information
Due Date:March 28, 2019
Opening Time:2:00 p.m.
Published Date:February 21, 2019
Last Updated:April 01, 2019
Bid Orientation:Non-Mandatory Job Walk: Thursday, March 7, 2019, 9 a.m., Cesar Chavez Library, 605 N. El Dorado Street, Stockton, CA 95202.
Description:CESAR CHAVEZ LIBRARY STAFF AND CHILDREN'S RESTROOM RENOVATIONS AND ADA COMPLIANCE
Renovation of two staff and two children's restrooms at the Cesar Chavez Library
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Job Walk (3-7-2019)
Document:Plan Holder's List (3-26-19)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (2-21-19)

 


 

Project Number: PW1814
General Information
Due Date:March 21, 2019
Opening Time:2 pm
Published Date:February 25, 2019
Last Updated:March 22, 2019
Bid Orientation:N/A
Description:LOCAL STREET RESURFACING PROGRAM FY 2018-19 SB1
The project is to resurface the various residential/local street in Stockton. The project includes slurry sealing, crack sealing, base failure repair and removal and replacement of pavement striping/legends.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerThinh Phan(209) 937-8885Thinh.Phan@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Document:Bid Comparison Sheet
Job Walk & Plan Holder's List:
Document:Plan Holders List
Specifications:
Document:Special Provisions
Document:Project Map
Document:Street List and Quantity Tracking

 


 

Project Number: OM-19-061
General Information
Due Date:February 28, 2019
Opening Time:4 pm
Published Date:February 12, 2019
Last Updated:February 12, 2019
Bid Orientation:N/A
Description:GRANT WRITING ASSISTANCE FOR THE STATEWIDE PARK DEVELOPMENT AND COMMUNITY REVITALIZATION PROGRAM (PROPOSITION 68)
The City of Stockton is requesting proposals from qualified firms to provide grant writing assistance for various grants funded through the California Drought, Water, Parks, Climate, Coastal Protection, and Outdoor Access for All Act of 2018 (Proposition 68)
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: OM-19-032
General Information
Due Date:February 14, 2019
Opening Time:3 pm
Published Date:January 03, 2019
Last Updated:February 12, 2019
Bid Orientation:Job Walk will take place on Wednesday, January 23, 2019.
Description:FIRE AND SECURITY ALARM INSTALLATION, MONITORING, MAINTENANCE, REPAIR, INSPECTION, AND TESTING
The City of Stockton is soliciting proposals from qualified Alarm Company Operators for Fire and Security Alarm System Installation, Monitoring, Maintenance, Repair, Inspection, and Testing.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Contacts:
Role:Name:Phone:Email:
Project ManagerColin Scott(209) 937-8954Colin.Scott@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No 1
Document:Questions and Answers (2-12-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Job Walk Sign In Sheet Day 1
Document:Job Walk Sign In Sheet Day 2
Document:Job Walk Sign In Sheet Day 3

 


 

Project Number: SEB-19-002
General Information
Due Date:February 05, 2019
Opening Time:3:00 p.m.
Published Date:August 22, 2018
Last Updated:August 22, 2018
Bid Orientation:Non-Mandatory Site Visit: Wednesday, January 23, 2019, 10:00 a.m., Weber Towers, 501 W. Weber Avenue, Lobby Area, Stockton, CA, 95202
Description:REQUEST FOR PROPOSALS (RFP) - ENERGY AUDIT OF THE WEBER TOWERS
Seeking qualified firms to provide an energy audit for the Weber Towers resulting in improvements that will benefit the City in the long term from an energy and sustainability standpoint.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinance link
Insurance Requirementslink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerWes Johnson(209) 937-8088wes.johnson@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Sign-In Sheet (1-24-19)
Document:Plan Holder's List (Updated 1-25-19)
Notice:UPDATED
Document:Notice Inviting Proposals
Document:Request for Proposals
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1611_CML-5008_165
General Information
Due Date:January 28, 2019
Opening Time:3:00 p.m.
Published Date:December 27, 2018
Last Updated:January 08, 2019
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - WEST LANE TRAFFIC RESPONSIVE SIGNAL CONTROL SYSTEM
Design and implement traffic responsive signal control system along West Lane corridor, between Harding Way and Enterprise Street, to provide advance signal coordination on real time traffic needs, includes design for needed upgrades to traffic systems, signal equipment and cabinet upgrades. Also includes generating traffic count data, timing design for corner ramp modifications to current ADA requirements.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Plan Holder's List (1-8-19)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-19-016
General Information
Due Date:January 09, 2019
Opening Time:3 p.m.
Published Date:November 08, 2018
Last Updated:December 27, 2018
Bid Orientation:8:30 a.m. Tuesday, November 27, 2018. Start at Main PD at 22 E. Market Street, Stockton, CA 95202
8:30 am, Wednesday, November 28, 2018. Start at Fire Station 13, 3606 Hendrix Dr., Stockton, CA 95212
Description:REQUEST FOR PROPOSAL FOR PROFESSIONAL PEST CONTROL SERVICES
The City of Stockton is seeking proposals from qualified pest control applicators for professional pest control services at various City facilities.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerJennifer Booth(209) 937-7582Jennifer.Booth@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Job Walk Sign-In Sheet
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: SEB-19-003
General Information
Due Date:December 20, 2018
Opening Time:3:00 p.m.
Published Date:November 20, 2018
Last Updated:November 20, 2018
Bid Orientation:n/a
Description:REQUEST FOR QUALIFICATIONS (RFQ) - ON-CALL MATERIAL TESTING SERVICES FOR VARIOUS CITY PROJECTS
Statement of Qualifications (SOQ) from qualified consulting firms to provide material testing services (lab testing, material testing, specialty inspections, and related services) for various City projects during construction.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055joshua.lewis@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (12-10-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1610
General Information
Due Date:December 20, 2018
Opening Time:2 pm
Published Date:November 26, 2018
Last Updated:December 24, 2018
Bid Orientation:December 11, 10 am, City Council Chamber, 425 N. El Dorado Street, Stockton, CA 95202.
Description:FFY 2016-17 STREET RESURFACING PROJECT, PW1610, STPL-5008(172)
The street resurfacing project includes base failure (6 dig-outs), 3 asphalt concrete (AC) overlay with the installation of wheelchair ramps, repairs to existing curb, gutter, detector loops, and hand holes. The scope of work includes Arch Raod (1.16 miles), March Lane (1.35 miles), Pershing Avenue (.5 miles). The total length of roads to be resurfaced is 3.01 miles.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
State Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 937-8346Omar.Al-Hindi@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract - PW1610
Document:Bid Comparison - PW1610
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign In Sheet
Document:Plan Holders List
Specifications:
Document:Project Map - PW1610
Document:Project Plans - PW1610
Document:Special Provisions
Document:Bid Forms

 


 

Project Number: PW1532
General Information
Due Date:December 20, 2018
Opening Time:2 pm
Published Date:November 21, 2018
Last Updated:December 27, 2018
Bid Orientation:N/A
Description:LOCAL STREET RESURFACING PROGRAM
The project is to resurface various residential/local streets in Stockton. The project includes micro-surfacing, removal and replacement of pavement striping/legends and installation of truncated dome.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerThinh Phan(209) 937-8885Thinh.Phan@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract - PW1532
Document:Bid Comparison - PW1532
Job Walk & Plan Holder's List:
Document:Plan Holders List

 


 

Project Number: PW1808
General Information
Due Date:December 14, 2018
Opening Time:3:00 p.m.
Published Date:November 15, 2018
Last Updated:November 15, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - SOUTH AIRPORT WAY SEPARATED BIKEWAY PROJECT
Work consists of designing 3.5 miles of separated bicycle lanes with vertical delineators and sidewalk to close gaps along South Airport Way.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: M18032
General Information
Due Date:December 13, 2018
Opening Time:3:00 p.m.
Published Date:November 13, 2018
Last Updated:November 13, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - PILGRIM AND UNION STREETS EASEMENT SANITARY SEWER LINE REHABILITATION
Provide professional engineering services to prepare the design documents (PSE) to rehabilitate a six inch sanitary sewer line in an easement east of Lincoln Street between Howard Street and Sixth Street.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055joshua.lewis@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: M18031
General Information
Due Date:December 13, 2018
Opening Time:3:00 p.m.
Published Date:November 13, 2018
Last Updated:November 13, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - HOWARD STREET SANITARY SEWER LINE REHABILITATION
Provide professional engineering services to prepare the design documents (PSE) to rehabilitate a six inch sanitary sewer line in an easement east of Lincoln Street between Howard Street and Sixth Street.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRay Deyto(209) 937-8869ray.deyto@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-19-010
General Information
Due Date:November 29, 2018
Opening Time:2 p.m.
Published Date:October 23, 2018
Last Updated:November 27, 2018
Bid Orientation:November 7, 2018, at 9:00 a.m., Municipal Services Center, 1465 South Lincoln, Stockton, CA
Description:STREETSCAPE LANDSCAPE MAINTENANCE
The City of Stockton desires to procure the services of a licensed landscape contractor to provide streetscape landscape maintenance, weed control and tree services for areas such as street medinas, areas between curb and fence, tree wells, and open space areas.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List
Specifications:
Document:Special Provisions
Document:Bid Forms
Document:Instructions to Vendors

 


 

Project Number: M18030
General Information
Due Date:November 29, 2018
Opening Time:3:00 p.m.
Published Date:October 29, 2018
Last Updated:November 14, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MORMON SLOUGH SANITARY SEWER LINE REHABILITATION PROJECT
Provide professional engineering services to prepare the design documents (PSE) to replace approximately 1,795-feet or existing 24-inch sewer line along Mormon Slough between Sierra Nevada Street and Bieghle Avenue.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134Rosa.Alvarez@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1809
General Information
Due Date:November 15, 2018
Opening Time:3:00 p.m.
Published Date:October 01, 2018
Last Updated:October 24, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - SAFE ROUTES TO SCHOOLS PRIORITY SAFETY PROJECTS
Design and construct crossing improvements, including new raised medians, pedestrian refuge islands at crossings, road diets, curb and gutter, curb ramps, and high visibility crosswalks signing and striping to improve safety and accessibility for pedestrians at 14 locations at 6 schools throughout Stockton.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRay Deyto(209) 937-8869Ray.Deyto@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (10-24-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (10-1-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-19-019
General Information
Due Date:November 15, 2018
Opening Time:2 p.m.
Published Date:October 25, 2018
Last Updated:October 23, 2018
Bid Orientation:November 6, 2018, 9:00 a.m., Start at Sousa Pool, 2900 Yellowstone Ave, Stockton, CA 95205
Description:POOL WATER AND FILTER SYSTEM MAINTENANCE
Maintenance of pool water for compliance with State and County Regulations for three pools. Maintenance of filter system media and cleaning as necessary to keep pools in compliance.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerBrad Mettler(209) 937-7261Brad.Mettler@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:
Document:Letter of Clarification No 1
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
Document:Special Provisions
Document:Bid Forms
Document:Instructions to Vendors

 


 

Project Number: OM-18-105
General Information
Due Date:November 15, 2018
Opening Time:2 p.m.
Published Date:October 23, 2018
Last Updated:November 16, 2018
Bid Orientation:N/A
Description:STREET LIGHTS KNOCKDOWNS PHASE II III
The Street Lights Knockdowns Phase II III will repair 15 street lights that were damaged by vehicle accidents throughout the City of Stockton. The scope of work for each location may vary depending on the severity of the impact. Please see the detailed description in the Special Provisions.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 937-8346Omar.Al-Hindi@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Job Walk & Plan Holder's List:
Document:Plan Holders List (11-14-18)
Specifications:
Document:Special Provisions
Document:Bid Forms
Document:Instructions to Bidders

 


 

Project Number: M18029
General Information
Due Date:November 08, 2018
Opening Time:3:00 p.m.
Published Date:October 01, 2018
Last Updated:October 16, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - SIERRA NEVADA STREET SANITARY SEWER LINE REHABILITATION
Prepare plans, specifications, and estimate leading to the rehabilitation of a 36 sanitary sewer line on Sierra Nevada Street between Hazelton Avenue and Worth Street
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRay Deyto(209) 937-8869Ray.Deyto@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: M17024_
General Information
Due Date:November 01, 2018
Opening Time:2:00 p.m.
Published Date:October 04, 2018
Last Updated:November 01, 2018
Bid Orientation:n/a
Description:MYRTLE STREET SANITARY SEWER LINE REHABILITATION PROJECT
Rehabilitation of 3,798 linear feet of 24 sanitary sewer along Myrtle Street from A Street to Filbert Street
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
State Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:
Document:Questions & Answers (10-9-18)
Submittals:UPDATED
Document:Bid Abstract (11-1-18)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (10-31-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (10-4-18)

 


 

Project Number: M17025_
General Information
Due Date:October 25, 2018
Opening Time:2:00 p.m.
Published Date:September 20, 2018
Last Updated:September 20, 2018
Bid Orientation:N/A
Description:DELLA STREET SANITARY SEWER REHABILITATION
Rehabilitation of 1,870 linear feet of 33-inch diameter sanitary sewer along Della Street from Hazelton Avenue to East Market Street.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209)937-7903ahbid.mohammad@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 9-26-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (9-20-18)

 


 

Project Number: PW1723_CML-5008_174
General Information
Due Date:October 05, 2018
Opening Time:3:00 p.m.
Published Date:September 07, 2018
Last Updated:September 07, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MONTAUBAN AVENUE AND HAMMERTOWN DRIVE ROUNDABOUT
Prepare plans, specifications, and estimate leading to the construction of a roundabout at the intersection of Montauban Avenue and Hammertown Drive. Installation of a bike lane on Montauban Avenue between Hammertown Drive and Swain Road.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055joshua.lewis@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1721_CML-5008_176
General Information
Due Date:October 04, 2018
Opening Time:3:00 PM
Published Date:September 07, 2018
Last Updated:September 07, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - LINCOLN STREET AND EIGHTH STREET ROUNDABOUT
Prepare plans, specifications, and estimate leading to the construction of a roundabout at the intersection of Eighth Street and Lincoln Street. Installation of a bike lane on Eighth Street between Lincoln Street and El Dorado Street.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492karla.cervantes@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1735
General Information
Due Date:August 20, 2018
Opening Time:3 pm
Published Date:August 08, 2018
Last Updated:August 13, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS, SERVICES FOR THE WEBER EVENTS CENTER FOUNTAIN FILTRATION RENOVATION
The City is seeking a professional design firm to provide design services and construction support services for renovating the Weber Events Center Interactive fountain filtration and chemical system to bring it into compliance with the most current San Joaquin County Environmental Health Department requirements and any applicable State and Federal requirements for this public work feature.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Requirementslink
Contacts:
Role:Name:Phone:Email:
Project ManagerBrad Mettler(209) 937-7261Brad.Mettler@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Plans, Attachments & Agendas:
Document:Northern California Prevailing Wage
Document:San Joaquin County Prevailing Wage

 


 

Project Number: PW1705_ATPCML-5008_178
General Information
Due Date:August 20, 2018
Opening Time:3:00 p.m.
Published Date:July 23, 2018
Last Updated:August 15, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - CLOSING PEDESTRIAN GAPS TO SCHOOLS PROJECT
Provide professional engineering services to prepare plans, specifications, and estimate for the Closing Gaps to Schools project
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299Mohammad.Sadiq@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1702_CML-5008_175
General Information
Due Date:August 02, 2018
Opening Time:3:00 pm
Published Date:June 21, 2018
Last Updated:July 10, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) - BEAR CREEK AND PIXLEY SLOUGH BICYCLE AND PEDESTRIAN PATH
The Consultant shall provide engineering services to prepare plans, specifications, and estimate to install rectangular rapid flashing beacons at four major intersections (Thornton Road/Bear Creek, Davis Road/Bear Creek, Whistler Way/Pixley Slough, and Rivermont Drive/Pixley Slough), bicycle and pedestrian pavement signage, and markings along Bear Creek and Pixley Slough Bicycle and Pedestrian Path, ADA ramps, and widen pavement sections along Eight Mile Road and Lower Sacramento Road to accommodate bicyclists and pedestrians. The project will also create a new Class III Bike Route along Eight Mile Road and Lower Sacramento Road.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134rosa.alvarez@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: M18054
General Information
Due Date:August 02, 2018
Opening Time:2:00 p.m.
Published Date:July 05, 2018
Last Updated:July 05, 2018
Bid Orientation:N/A
Description:2017-18 SANITARY SEWER MAINTENANCE HOLE REHABILITATION
Rehabilitation of sanitary sewer manhole at various locations throughout the City. Rehabilitation work consists of sewer maintenance hole cleaning, liner or coating removal, maintenance hole wall mortar repair, and rehabilitation of maintenance hole. Additional items included in the project include: project mobilization, traffic control, and water pollution control.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq(209) 937-8299mohammad.sadiq@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 8-1-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Vicinity Map
Document:State Wage Rates (7-5-18)

 


 

Project Number: PW1619
General Information
Due Date:July 26, 2018
Opening Time:2:00 p.m.
Published Date:July 02, 2018
Last Updated:July 26, 2018
Bid Orientation:Non-Mandatory Job Walk on Thursday, July 19, 2018, 10:00 a.m., Main Police Department, 22 E. Market Street, Stockton, CA 95202
Description:MAIN POLICE DEPARTMENT PARKING LOT IMPROVEMENTS
Rehabilitation of the existing parking lot located at the Main Police Department
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:
Document:Letter of Clarification No. 1 (7-24-18)
Submittals:UPDATED
Document:Bid Abstract (7-26-18)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (7-19-18)
Document:Job Walk Sign-In Sheet (7-19-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (7-2-18)

 


 

Project Number: PW_1618
General Information
Due Date:July 26, 2018
Opening Time:2:00 p.m.
Published Date:June 28, 2018
Last Updated:June 28, 2018
Bid Orientation:Non-Mandatory Job Walk: Tuesday, July 17, 2018, 10:00 a.m., Fire Station No. 2, 110 W. Sonora Street, Stockton, CA 95203.
Description:FIRE STATION NO. 2 KITCHEN IMPROVEMENTS
Renovation of Fire Station No. 2 Kitchen. Project located at 110 West Sonora, Stockton, CA 95203
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903ahbid.mohammad@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
Document:Bid Abstract - PW1618
Job Walk & Plan Holder's List:UPDATED
Document:Job Walk (7-17-18)
Document:Plan Holder's List (7-25-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (6-28-18)

 


 

Project Number: PW1704_BPMPL-5008_177
General Information
Due Date:June 28, 2018
Opening Time:3:00 p.m.
Published Date:May 24, 2018
Last Updated:June 18, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - BRIDGE REHABILITATION AND REPLACEMENT PROGRAM 2017/18
Seeking qualified firms to provide professional engineering services to prepare plans, specifications, and an estimate of probably construction costs. Also, prepare the necessary environmental documentation for this project.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (6-18-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holder's List (6-11-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1722_CML-5008_179
General Information
Due Date:June 25, 2018
Opening Time:3:00 PM
Published Date:May 08, 2018
Last Updated:May 08, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) - MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS
The project proposes to widen, and reconstruct the existing pathway to Class I Bicycle and Pedestrian path standards. The project will install intersections and mid-block improvements, high visibility crosswalks, signage, striping, update ramps to Americans with Disabilities Act (ADA) standards, install flashing beacons at Feather River Drive and DaVinci Drive, and improve path connections to adjacent businesses. The project will also add wayfinding signage along the EBMUD right of way between Brookside Road and Hillsboro Way, and continue east on March Lane to West Lane and north on West Lane between to EBMUD.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492karla.cervantes@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1515_CML-5008_148
General Information
Due Date:June 19, 2018
Opening Time:3:00 p.m.
Published Date:May 24, 2018
Last Updated:June 13, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) BUS RAPID TRANSIT (BRT) PHASE 1B CORRIDOR IMPROVEMENTS
Seeking qualified consulting firm to provide preliminary and final engineering services leading to the completion of plans, specifications, and estimates for construction of the desired improvements. Improvements include modifications and upgrade to the existing traffic signals along Pacific Avenue, Madison Street, Fremont Street, Center Street, Miner Avenue, and Sutter Street
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project Manager Rosa Alvarez(209) 937-8134Rosa.Alvarez@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (6-11-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1607_PW1732_PW1515
General Information
Due Date:June 07, 2018
Opening Time:3:00 PM
Published Date:May 10, 2018
Last Updated:May 10, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MINER AVENUE COMPLETE STREET IMPROVEMENTS, Federal Project No. ATP 5008(158)/City Project No. PW1607, Federal Project No. ATP 5008(170)/City Project No. PW1732, and Federal Project No. CML 5008(148)/City Project No. PW1515
Seeking qualified consulting firm to provide professional consultant services to design the Miner Avenue Complete Street Improvements project located between Center Street and Aurora Street.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134rosa.alvarez@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226analissa.nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1727_CML-5008_173
General Information
Due Date:June 06, 2018
Opening Time:3:00 p.m.
Published Date:April 12, 2018
Last Updated:April 12, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - TAM O'SHANTER DRIVE AND KNICKERBOCKER DRIVE ROUNDABOUT
Prepare plans, specifications, and estimate (PSE) leading to the construction of a roundabout at the intersection of Tam O'Shanter Drive and Knickerbocker Drive and installation of bike lane on Tam O'Shanter Drive between Knickerbocker Drive and Hammer Lane.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project Manager Ray Deyto(209) 937-8869ray.deyto@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 5-22-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-18-093
General Information
Due Date:May 31, 2018
Opening Time:3 pm
Published Date:May 10, 2018
Last Updated:May 10, 2018
Bid Orientation:N/A
Description:HOMELESS EMPLOYMENT LITTER PROGRAM
The City of Stockton is requesting written proposals from qualified non-profit social service organizations for the management and operation of the Homeless Employment Litter Program.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJennifer Booth(209) 937-7582Jennifer.Booth@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: SEB-18-005
General Information
Due Date:May 30, 2018
Opening Time:4:00 PM
Published Date:May 09, 2018
Last Updated:May 09, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM - CYCLE 9
To provide professional grant writing assistance for Cycle 9 of the federal Highway Safety Improvement Program.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerWes Johnson(209) 937-8088wes.johnson@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (Updated 5-22-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 5-22-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-18-082
General Information
Due Date:May 24, 2018
Opening Time:2 pm
Published Date:April 26, 2018
Last Updated:May 29, 2018
Bid Orientation:MANDATORY Pre-bid Meeting: Tuesday, May 8 at 9 am at the Municipal Service Center, 1465 S Lincoln St., Stockton, CA 95206
Description:STREETSCAPE LANDSCAPE MAINTENANCE
The City of Stockton desires to procure the services of a licensed landscape contractor to provide streetscape landscape maintenance, weed control and tree services for areas such as street medians, areas between curb and fence, tree wells, and open space areas.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:UPDATED
Document:OM-18-082 Pre-Bid Sign In Sheet
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holders List (5-17-18)

 


 

Project Number: SEB-18-004
General Information
Due Date:May 23, 2018
Opening Time:4:00 p.m.
Published Date:May 02, 2018
Last Updated:May 02, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM
To provide professional grant writing assistance for the Active Transportation Program (ATP) Cycle 4 in 2018.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerWes Johnson(209) 937-8088wes.johnson@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 5/22/18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: M15001
General Information
Due Date:May 17, 2018
Opening Time:2:00 P.M.
Published Date:April 18, 2018
Last Updated:April 18, 2018
Bid Orientation:N/A
Description:ALEXANDRIA PLACE SEWER TRUNK LINE REHABILITATION
Rehabilitate approximately 4,511 feet of 48-inch and 1,547 feet of 54-inch sewer trunk line along Alexandria Place between Swain Road and Lincoln Road (Swenson Park). Project also includes traffic control, CCTV and cleaning, maintenance hole rehabilitation and sewer bypass.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134rosa.alvarez@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (Updated 5-1-18)
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List (Updated 5-14-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:UPDATED
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (4-18-18)
Document:Attachment A (5-1-18)

 


 

Project Number: PW1616
General Information
Due Date:May 10, 2018
Opening Time:3:00 p.m.
Published Date:April 02, 2018
Last Updated:April 02, 2018
Bid Orientation:Non-mandatory Job Walk: Monday April 16, 2018 at 9:00 a.m., Corporation Yard, 1465 South Lincoln Street, Stockton, CA 95206.
Description:REQUEST FOR PROPOSALS (RFP) - VEHICLE AND EQUIPMENT WASH RACK IMPROVEMENTS AND UPGRADES
Prepare plans, specifications, and estimate (PSE) to improve/upgrade the existing vehicle and equipment wash rack facility at the City of Stockton's Corporation Yard.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
State Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRay Deyto(209) 937-8869Ray.Deyto@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-18-087
General Information
Due Date:April 16, 2018
Opening Time:3 pm
Published Date:March 28, 2018
Last Updated:April 10, 2018
Bid Orientation:N/A
Description:ELEVATOR MAINTENANCE AND REPAIR SERVICES
Perform complete preventative maintenance and repair service on City of Stockton elevators, dumbwatiers and lifts.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJennifer Booth(209) 937-7582Jennifer.Booth@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (4-10-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.

 


 

Project Number: PW1418_STPL-5008_159
General Information
Due Date:April 12, 2018
Opening Time:2:00 P.M.
Published Date:March 01, 2018
Last Updated:March 01, 2018
Bid Orientation:Pre-Bid Meeting: Tuesday, March 13, 2018, 10:30 a.m., City Hall Council Chambers, 2nd floor, 425 N. El Dorado Street, Stockton, CA 95202
Description:FRENCH CAMP ROAD/I-5 INTERCHANGE LANDSCAPING
Install landscaping at the intersection of French Camp Road and Interstate 5.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRay Deyto(209) 937-8869ray.deyto@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:UPDATED
Document:Pre-bid Meeting (3-13-18)
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 4-11-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (3-1-18)
Document:Federal Wage Rates (4-4-18)

 


 

Project Number: PW1720_CML-5008_169
General Information
Due Date:April 02, 2018
Opening Time:3:00 P.M.
Published Date:March 01, 2018
Last Updated:March 01, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - LEFT-TURN LANE ADDITIONS AT VARIOUS LOCATIONS
Install left-turn lanes at intersections of West Lane and Bianchi Road, March Lane and Feather River Drive, and Airport Way and Sperry Road (Arch-Airport Road).
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243parviz.chitsazan@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (3-9-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Letter of Clarification No. 1 (3-26-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: M16006
General Information
Due Date:March 22, 2018
Opening Time:2:00 p.m.
Published Date:February 21, 2018
Last Updated:February 21, 2018
Bid Orientation:N/A
Description:2016 SANITARY SEWER REHABILITATION
Replace approximately 1,787 feet of existing 6 inch sewer lines throughout the City of Stockton. Project also includes temporary bypassing, CCTV, reconnection of service laterals, pavement, and traffic control.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134rosa.alvarez@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (Updated 3-15-18)
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (Updated 3-13-18)
Specifications:UPDATED
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (2-21-18)

 


 

Project Number: OM-18-088
General Information
Due Date:March 15, 2018
Opening Time:2 pm
Published Date:March 01, 2018
Last Updated:March 14, 2018
Bid Orientation:N/A
Description:PURCHASE OF HOT MIX ASPHALT THROUGH DECEMBER 2020
Purchase of hot mix asphalt material in incremental quantities.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ContactBarbara Hedrick(209) 937-8317Barbara.Hedrick@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification #1 (3-14-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List (3-12-18)
Notice:
Document:Notice Inviting Bids
Plans, Attachments & Agendas:
Document:Instructions to Bidders

 


 

Project Number: PW1724
General Information
Due Date:March 06, 2018
Opening Time:3:00 P.M.
Published Date:February 09, 2018
Last Updated:February 09, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - NORTHEAST STOCKTON LIBRARY AND RECREATION CENTER
Solicitation of proposals from Engineering and Architectural consultants to provide design services for the Northeast Stockton McNair Library and Recreation Center. The 4.83 acre is located at 9501 West Lane. Scope of work shall include a space planning study, public outreach, environmental clearances, production of project plans, specifications, and construction estimates.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAntonio Tovar(209) 937-7390antonio.tovar@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (3-5-18)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1715_HSIPL-5008_161
General Information
Due Date:February 23, 2018
Opening Time:3:00 pm
Published Date:January 18, 2018
Last Updated:January 18, 2018
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - INSTALL PEDESTRIAN CROSSINGS AT NINE INTERSECTIONS
Professional Consultant Services to design the installation of pedestrian crossings with flashing beacons at nine locations.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMonique Raqueno(209) 937-8613monique.raqueno@stocktonca.gov
Plan Holder ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1312_CML-5008_127
General Information
Due Date:February 22, 2018
Opening Time:2:00 p.m.
Published Date:January 30, 2018
Last Updated:February 22, 2018
Bid Orientation:Wednesday, February 7, 2018, 10:30 a.m., City Hall Council Chambers, 425 N. El Dorado Street, Stockton, CA 95202
Description:MARCH LANE ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS)
Install an adaptive traffic control system at 19 signalized intersections along the March Lane Corridor. Work involves installing loops, upgrade of cabinets, CCTV cameras, controllers, and communication equipment.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerDennis Yep(209) 937-8825Dennis.Yep@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Questions & Answers:
Document:Letter of Clarification No. 1 (2-20-18)
Submittals:UPDATED
Document:Bid Abstract (2-22-18)
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign In Sheet (2-7-18)
Document:Plan Holder's List (2-22-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Vicinity Map
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (1-30-18)
Document:Federal Wage Rates (2-15-18)

 


 

Project Number: PW1716_HSIPL-5008_167
General Information
Due Date:February 14, 2018
Opening Time:3:00 P.M.
Published Date:January 16, 2018
Last Updated:January 16, 2018
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - RAISED MEDIAN ALONG DR. MARTIN LUTHER KING JR. BOULEVARD
Prepare plans, specifications, and engineer's estimate for the project. The project will install raised median to limit unsafe turning movements along Dr. Martin Luther King Jr. Boulevard between Beighle Alley and Mariposa Road.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJason Bustos(209) 937-8868jason.bustos@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (2-6-18)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1719_HSIPL-5008_162
General Information
Due Date:January 24, 2018
Opening Time:3:00 p.m.
Published Date:December 21, 2017
Last Updated:December 21, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - ROAD DIET ON NORTH EL DORADO STREET, TURN AND BIKE LANES PROJECT
Prepare plans, specifications, and engineer's estimate for the project. The project will reduce the travel lanes on North El Dorado Street between Hammer Lane and Morada Lane from four lanes to three, to accommodate a center two way left turn lane and install new bike lanes.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJason Bustos(209) 937-8868jason.bustos@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW9934_PW1529
General Information
Due Date:January 11, 2018
Opening Time:2:00 p.m.
Published Date:December 14, 2017
Last Updated:January 12, 2018
Bid Orientation:n/a
Description:TRAFFIC SIGNAL AND SAFETY LIGHTING MODIFICATIONS AT THE INTERSECTIONS OF PACIFIC AVENUE/CASTLE STREET AND HAMMER LANE/KELLEY DRIVE
Work includes: Modifying existing traffic signals, installing Emergency Vehicle Pre-emption (EVP), wheelchair ramps, signs and striping, and signal wiring conduits.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:
Document:Questions and Answers (1-10-18)
Submittals:UPDATED
Document:Bid Abstract (1-11-18)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (1-11-18)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (12-14-17)

 


 

Project Number: SEB_18-002
General Information
Due Date:December 15, 2017
Opening Time:3:00 p.m.
Published Date:November 14, 2017
Last Updated:December 12, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - OUTREACH AND MARKETING FIRM FOR SOLID WASTE RECYCLING PROGRAMS
Provide professional marketing and outreach services to propose an advertising and outreach campaign with coordinated promotions to increase awareness and reinforce residential, commercial, and industrial recycling and organic waste diversion.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Report link
Contacts:
Role:Name:Phone:Email:
Project ManagerSabine Verelst(209) 937-7579Sabine.Verelst@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (12-12-17)
Specifications:
Document:Special Provisions
Plans, Attachments & Agendas:
Document:Scope of Services
Document:Instructions to Proposers

 


 

Project Number: PW_1531
General Information
Due Date:December 07, 2017
Opening Time:2 pm
Published Date:November 15, 2017
Last Updated:December 13, 2017
Bid Orientation:N/A
Description:CURB GUTTER AND SIDEWALK REPAIR AND CURB-RAMP INSTALLATION PHASE II
The project include removal and replacement of curb, gutter and sidewalk damaged by City tree roots at various locations citywide. An alternate bid was also included for removal and replacement of curb, gutter and siewalk, and installation of ADA curb-ramps on Harding Way.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project EngineerThinh Phan(209) 937-8885Thinh.Phan@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Document:Bid Comparison Sheet
Job Walk & Plan Holder's List:
Document:Plan Holders List
Specifications:
Document:Special Provisions
Document:Project Locations
Document:Standard Drawing No. 32D
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Prevailing Wage - State
Document:Prevailing Wage - Northern
Document:Bid Forms (2017-11-27)

 


 

Project Number: PW1516_CML-5008_149
General Information
Due Date:December 04, 2017
Opening Time:3:00 p.m.
Published Date:November 06, 2017
Last Updated:November 30, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - BUS RAPID TRANSIT (BRT) PHASE V
Professional Consultant Services to design Phase V of the Bus Rapid Transit on segments of Weber Avenue, Miner Avenue, Wilson Way, Fremont Street, and Main Street
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktonca.gov
Analissa NunezPlan Holder's List(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (11-13-17)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1713_HSIPL-5008_166
General Information
Due Date:November 14, 2017
Opening Time:3:00 p.m.
Published Date:October 12, 2017
Last Updated:October 12, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - CONVERT SIGNALS FROM PEDESTAL-MOUNTED TO MAST ARMS (AT THE INTERSECTIONS OF DR. MARTIN LUTHER KING, JR. BOULEVARD AND SAN JOAQUIN STREET, CALIFORNIAL STREET, AND GRANT STREET, AND PROVIDE PROTECTED LEFT-TURNS AT THE INTERSECTIONS OF SAN JOAQUIN STREET AND GRANT STREET)
Traffic signal modifications at the intersections of Dr. Martin Luther King Jr. Boulevard and San Joaquin Street, California Street and Grant Street.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243parviz.chitsazan@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (11-6-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (10-13-17)
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-18-062
General Information
Due Date:October 26, 2017
Opening Time:2 p.m.
Published Date:October 05, 2017
Last Updated:October 19, 2017
Bid Orientation:Thursday, October 12, 2017 at 8 a.m.Municipal Service Center, 1465 S. Lincoln St., Stockton, CA
Description:PARKS MAINTENANCE PROJECT
The parks maintenance work compromises general horticultural maintenance including, but not limited to mowing, edging, turf trimming, shrub trimming, fertilizing, litter/trash collection, graffiti abatement, weed control, minor tree work, operation of manual and automatic irrigation systems, turf aeration, disposal of the material collected and janitorial/site cleaning/play equipment inspection including, but not limited to regularly scheduled trash collection, emptying trash receptacles, cleaning restrooms and restocking with supplies, washing site furnishings and structures such as tables and benches, service buildings, bathrooms, game courts, play structures and shade structures, regular inspection of play equipment and fall surfacing and disposal of the material found/collected.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Bid Forms
Document:Northern California Prevailing Wage
Document:SJ County Prevailing Wage

 


 

Project Number: PW1718_HRRRL-5008_163
General Information
Due Date:October 17, 2017
Opening Time:12:00 p.m.
Published Date:September 18, 2017
Last Updated:September 18, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - RAISED MEDIAN AT EL DORADO STREET (BETWEEN ESSEX AND THE CALAVERAS RIVER BRIDGE)
Prepare plans, specifications, and engineer's estimate for the project. The project will install a raised median with fencing to prevent jaywalking from Ingram Street to the Calaveras River Bridge. The project will also install 19 ADA curb ramps between Ingram Street and Essex Street, and will repair broken sidewalk, curb, and gutter in the project area. A left turn pocket will be installed at Harper Street. ADA ramp installation may require relocation and upgrade of existing storm drain inlets.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSharla Hardy(209) 937-8374sharla.hardy@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1714_HSIPL-5008_168
General Information
Due Date:October 12, 2017
Opening Time:12:00 p.m.
Published Date:September 18, 2017
Last Updated:September 18, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - INSTALL GUARDRAILS PROJECT (16 LOCATIONS)
Upgrade of existing guardrails at 16 locations throughout the City.
Award Date:N/A
Related Links:
Description:URL:
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903ahbid.mohammad@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1617
General Information
Due Date:October 12, 2017
Opening Time:2:00 p.m.
Published Date:September 14, 2017
Last Updated:October 13, 2017
Bid Orientation:n/a
Description:FIRE STATION NO. 2 DRIVEWAY REPLACEMENT
Rehabilitation and widening of existing concrete driveway at Fire Station No. 2 located at 110 W. Sonora Street.
Award Date:N/A
Related Links:
Description:URL:
Local Business Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Analissa.NunezPlan Holder's List (209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract (10-12-17)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (10-10-17)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (9-14-17)

 


 

Project Number: PW1717_HSIPL-5008_164
General Information
Due Date:September 27, 2017
Opening Time:2:00 PM
Published Date:July 20, 2017
Last Updated:July 20, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) RAISED MEDIAN ALONG PACIFIC AVENUE
Prepare plans, specifications, and estimate leading to the construction of the raised median curbs along Pacific Avenue between the Calaveras River and Hammer Lane.
Award Date:N/A
Related Links:
Description:URL:
State Wageslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerRay Deyto(209) 937-8869ray.deyto@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (9-5-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-18-024
General Information
Due Date:September 22, 2017
Opening Time:3 pm
Published Date:August 31, 2017
Last Updated:September 21, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL FOR ON-CALL TRAFFIC SIGNAL DETECTOR LOOPS INSTALLATION AND REPLACEMENT SERVICES
The City of Stockton is seeking qualified contractors to provide professional services for On-Call Traffic Signal Detector Loops Installation and Repair Services. Selected contractor shall perform traffic signal detector loops, wire replacement, installation (Schedule 80), road boxes and hand holes. City staff will mark out all locations for the detector loops.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Prevailing Wage Requirementslink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 937-8346Omar.Al-Hindi@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List
Specifications:
Document:Detector Loops On-Call RFP

 


 

Project Number: OM-18-010
General Information
Due Date:August 24, 2017
Opening Time:2 p.m.
Published Date:August 03, 2017
Last Updated:August 21, 2017
Bid Orientation:August 14, 2017 at 9:30 a.m., Municipal Service Center, 1465 S. Lincoln St., Stockton, CA
Description:PARKS MAINTENANCE AND JANITORIAL
Park maintenance, janitorial, and play equipment inspections.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7115Miguel.Mendoza@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List (8-23-17)
Plans, Attachments & Agendas:UPDATED
Document:Instructions to Bidders
Document:Prevailing Wage - Northern
Document:Prevailing Wage - County
Document:Bid Forms 8-21-17

 


 

Project Number: PW1601_ATPLNI-5008_160
General Information
Due Date:August 15, 2017
Opening Time:12:00 p.m.
Published Date:July 19, 2017
Last Updated:July 19, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - GREATER DOWNTOWN ACTIVE TRANSPORTATION PLAN
Provide a multi-modal mobility, bicycle and pedestrian plan to develop the Greater Downtown Active Transportation Plan. Area is bounded by Pershing Avenue, Wilson Way, Martin Luther King, Jr. Boulevard, and Harding Way.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerAntonio Tovar(209) 937-7390antonio.tovar@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (8-7-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1609_HSIPL-5008_155
General Information
Due Date:July 27, 2017
Opening Time:3:00 p.m.
Published Date:June 29, 2017
Last Updated:June 29, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - HUNTER STREET ROAD DIET/BIKE LANE INSTALLATION
To reduce the travel lanes on Hunter Street between Harding Way and Miner Avenue from four lanes to three (Road Diet), to accommodate a center two-way left turn lane and install new bike lanes. Selected firm will provide project coordination, design, and surveying services.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerCliff Gayotin(209) 937-8241cliff.gayotin@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-17-136
General Information
Due Date:June 22, 2017
Opening Time:2 pm
Published Date:June 19, 2017
Last Updated:June 19, 2017
Bid Orientation:N/A
Description:SHOWMOBILE HAULING AND SET-UP
Deliver showmobile from the City of Stockton's Corporation Yard located at 1465 S. Lincoln Street, haul to event location as determined by schedule (refer to sample schedule attached), set up, tear-down, and deliver back to Corporation Yard.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Planholders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Project ManagerTracy Pengilly(209) 937-8867Tracy.Pengilly@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Notice Inviting Bids
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: OM-17-017
General Information
Due Date:June 01, 2017
Opening Time:3 pm
Published Date:May 04, 2017
Last Updated:May 25, 2017
Bid Orientation:N/A
Description:ON-CALL IRRIGATION PUMP REPAIR SERVICE
Multi-year on-call services contract for repair of centrifugal and turbine pump systems (some with Variable Frequency Drives) used for irrigation at park sites and green spaces (green belts, street landscaping, medians, etc.) within the City limits, throughout the City of Stockton.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerDianne Love(209) 937-8283Dianne.Love@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions - Answers (5-25-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List (5-17-17)
Specifications:
Document:Special Provision
Document:Scope of Work
Document:Partial List of Sites

 


 

Project Number: PW1438_ATPL-5008_140
General Information
Due Date:May 18, 2017
Opening Time:2:00 p.m.
Published Date:April 13, 2017
Last Updated:May 18, 2017
Bid Orientation:n/a
Description:FREMONT SQUARE SIDEWALK RECONSTRUCTION PATH PROJECT
The Fremont Square Sidewalk Reconstruction Path Project will reconstruct sidewalks along the perimeter of the Fremont Square with a rubberized surface. The project will also remove and replace curb ramps, relocate pedestrian lighting, add bicycle racks.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492Karla.Cervantes@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract (5-18-17)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (5-16-17)
Specifications:
Document:Bid Forms
Document:Specifications
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (4-13-17)

 


 

Project Number: OM-17-112
General Information
Due Date:May 04, 2017
Opening Time:3 pm
Published Date:April 13, 2017
Last Updated:April 13, 2017
Bid Orientation:N/A
Description:CITY OF STOCKTON FACILITIES ON-CALL MAINTENANCE AND REPAIR SERVICES
Perform On-call plumbing maintenance, repair, modifications, and improvements at all facilities owned or operated by the City of Stockton and/or sites as required/requested.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerPaul Acosta(209) 937-5069 Paul.Acosta@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List
Plans, Attachments & Agendas:
Document:State Prevailing Wage Rates

 


 

Project Number: OM-17-010
General Information
Due Date:May 04, 2017
Opening Time:2 pm
Published Date:April 13, 2017
Last Updated:May 30, 2017
Bid Orientation:N/A
Description:PARK LANDSCAPING PEST CONTROL
Provide pest control and removal services at City parks, streetscapes and open spaces.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holders List (5-4-07)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:State Prevailing Wage Rates

 


 

Project Number: OM-17-047
General Information
Due Date:April 27, 2017
Opening Time:2 pm
Published Date:April 06, 2017
Last Updated:April 26, 2017
Bid Orientation:N/A
Description:EMERGENCY ON-CALL TREE SERVICES
Emergency on-call tree services as needed/requested.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerDianne Love(209) 937-8283Dianne.Love@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List
Specifications:
Document:Scope of Work
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:State Prevailing Wages (04-06-17)

 


 

Project Number: M15003
General Information
Due Date:April 27, 2017
Opening Time:2:00 p.m.
Published Date:March 09, 2017
Last Updated:March 09, 2017
Bid Orientation:N/A
Description:NAVY DRIVE SANITARY SEWER REHABILITATION, PROJECT NO. M15003
Rehabilitate approximately 1,967 feet of 24-inch, and 3,907 feet of 48-inch sewer trunk line between Interstate 5 and Fresno Avenue. Project also includes traffic control plans, maintenance hole rehabilitation, and sewer bypassing.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerRosa Alvarez(209) 937-8134rosa.alvarez@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (3-23-17)
Specifications:
Document:Specifications
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (3-9-17)

 


 

Project Number: PW1303_CML-5008_123
General Information
Due Date:April 13, 2017
Opening Time:2:00 p.m.
Published Date:March 16, 2017
Last Updated:April 13, 2017
Bid Orientation:Tuesday, March 28, 2017, 10 a.m., City Hall Council Chambers 425 N. El Dorado St. Stockton, CA 95202
Description:BUS RAPID TRANSIT PHASE IV (BRT IV) ON CHARTER WAY/DR. MARTIN LUTHER KING JR. BLVD AND MARIPOSA ROAD
The work includes installing: Closed Circuit Television (CCTV) cameras, Transit Signal Priority (TSP) control devices at signalized intersections as shown on the plans, controller cabinets and controllers, electrical service cabinets, and signal writing conduits
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project Manager Parviz Chitsazan(209) 937-8243Parviz.Chitsazan@stocktongov.com
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktongov.com
Submittals:UPDATED
Document:Bid Abstract (4-13-17)
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting (3-28-17)
Document:Plan Holder's List (4-10-17)
Specifications:
Document:Specifications
Document:Bid Forms (Updated 4-11-17)
Plans, Attachments & Agendas:
Document:Plans
Document:Instructions to Bidders
Document:State Wage Rates (3-16-17)
Document:Federal Wage Rates (4-6-17)

 


 

Project Number: OM-17-103
General Information
Due Date:April 13, 2017
Opening Time:2 p.m.
Published Date:March 30, 2017
Last Updated:March 30, 2017
Bid Orientation:N/A
Description:TRUCK HAULING SERVICES FOR ASPHALT CONCRETE AND ASPHALT CONCRETE GRINDINGS
Provide truck hauling services on an as-needed basis.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSean Gallagher(209) 937-8105Sean.Gallagher@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List
Specifications:
Document:Special Provisions
Document:Bids Form
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Prevailing Wage (3-30-17)

 


 

Project Number: OM-17-102
General Information
Due Date:April 13, 2017
Opening Time:2 p.m.
Published Date:March 30, 2017
Last Updated:March 30, 2017
Bid Orientation:N/A
Description:ASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017
Provide asphalt concrete cold planing on City streets.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSean Gallager(209) 937-8105Sean.Gallagher@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List
Specifications:
Document:Special Provisions
Document:Bid Forms
Plans, Attachments & Agendas:
Document:Instructions to Bidders
Document:Prevailing Wages (3-30-17)

 


 

Project Number: PW1311_CML-5008_126
General Information
Due Date:March 30, 2017
Opening Time:2:00 p.m.
Published Date:February 22, 2017
Last Updated:February 22, 2017
Bid Orientation:Wednesday, March 22, 2017, 10:30 a.m., City Hall, 2nd floor Council Chambers, 425 N. El Dorado Street, Stockton, CA 95202.
Description:PERSHING AVENUE ADAPTIVE TRAFFIC CONTROL SYSTEM (ATCS)
Install an adaptive traffic control system at 16 signalized intersections along the Pershing Avenue Corridor. Work involves installing loops, upgrade of cabinets, CCTV cameras, controllers, and communication equipment.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerDennis Yep209-937-8825dennis.yep@stocktonca.gov
Plan Holder's ListChyerle Leach209-937-8412chyerle.leach@stocktonca.gov
Submittals:
Document:Bid Abstract
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (3-27-17)
Specifications:
Document:Bid Forms
Document:Specifications
Plans, Attachments & Agendas:UPDATED
Document:Instructions to Bidders
Document:Plans
Document:State Wage Rates (2-21-17)
Document:Federal Wage Rates (3-21-17)

 


 

Project Number: PW1517_CML-5008_150
General Information
Due Date:March 28, 2017
Opening Time:12:00 p.m.
Published Date:March 07, 2017
Last Updated:March 07, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - INSTALLATION AND UPGRADE OF BICYCLE FACILITIES (CLASS II AND III)
Provide design, bid support, and construction support for the above project. This project will install approximately 17 miles of Class III bike routes and approximately 1.8 miles of Class II bicycle lanes. One of the bike routes will be enhanced with sharrows and additional signage. In addition, the project will install signs along existing bike routes to increase awareness of and to encourage use of these routes.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSharla Hardy(209) 937-8374sharla.hardy@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (3-23-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (3-15-17)
Notice:
Document:Request For Proposals
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-17-099
General Information
Due Date:March 23, 2017
Opening Time:2 p.m.
Published Date:March 09, 2017
Last Updated:March 08, 2017
Bid Orientation:N/A
Description:PURCHASE OF HOT MIX ASPHALT THROUGH DECEMBER 2017
Purchase of hot mix asphalt material in incremental quantities.
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerSean Gallagher(209) 937-8105Sean.Gallagher@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Notice Inviting Bids
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Document:Bid Forms
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: PW1518_CML-5008_156
General Information
Due Date:March 16, 2017
Opening Time:12:00 p.m.
Published Date:February 16, 2017
Last Updated:March 09, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - INSTALL LEFT-TURN LANE ON THORNTON ROAD AT HAMMER LANE AND ON LOWER SACRAMENTO ROAD AT THORNTON ROAD/PACIFIC AVENUE
Provide professional consulting services to design the installation of a southbound (SB) left-turn lane on Thornton Road at Hammer Lane and a westbound (WB) left-turn lane on Lower Sacramento Road at the Thornton Road/Pacific Avenue junction, the project will also construct new medians, add stamped concrete and minor landscaping, upgrade/modify traffic signals, and install new ADA ramps.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492Karla.Cervantes@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions & Answers (3-9-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holder's List (2-16-17)
Notice:
Document:Request for Proposals
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1622_HSIPL-5008_153
General Information
Due Date:March 15, 2017
Opening Time:12:00 p.m.
Published Date:February 15, 2017
Last Updated:February 15, 2017
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) - HIGH FRICTION SURFACE TREATMENT PROJECT
This project will improve surface friction at segments near four (4) intersections. The locations are: Feather River Drive/Driftwood Place, Brookside Road/McGaw Street, Bianchi Road/Bidwell Place, and Manthey Road/Henry Long Boulevard. Work is to design, obtain environmental clearance and permits, and design support during construction.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerEmilio Morales209-937-5654emilio.morales@stocktonca.gov
Plan Holder's ListChyerle A. Leach209-937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (3-9-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (3-9-17)
Notice:
Document:Request for Proposals
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1420_HSIPL-5008_133
General Information
Due Date:March 09, 2017
Opening Time:2:00 p.m.
Published Date:February 09, 2017
Last Updated:March 09, 2017
Bid Orientation:Pre-Bid Meeting, Tuesday, February 21, 2017, 10:30 a.m., City Hall Council Chambers, 2nd Floor, 425 N. El Dorado Street, Stockton, CA 95202
Description:RAPID FLASHING BEACONS HSIP CYCLE 6 (Install Flashing Beacons Upgrade Crosswalks and Signs)
This project will include the installation of Rectangular Rapid Flashing Beacons and Frontage Improvements at existing uncontrolled crosswalks at various site locations throughout the City of Stockton to increase sight visibility and pedestrian/bicyclist safety.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMonique Raqueno(209) 937-8613Monique.Raqueno@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:UPDATED
Document:Bid Abstract (3-9-17)
Job Walk & Plan Holder's List:
Document:Pre-Bid Meeting Sign-in Sheet (2-21-17)
Document:Plan Holder's List (2-27-17)
Specifications:
Document:Specifications
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Plans
Document:Bid Forms
Document:State Wage Rates (2-9-17)
Document:Federal Wage Rates (2-9-17)

 


 

Project Number: SEB-17-003
General Information
Due Date:March 02, 2017
Opening Time:3:00 p.m.
Published Date:January 31, 2017
Last Updated:January 31, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - TRAFFIC SIGNAL, ROUNDABOUT, AND PROTECTED LEFT-TURN PHASING PRIORITY STUDIES
Consultant services to collect traffic volumes, pedestrian counts at various locations. Prepare Traffic Signals, Roundabout, and Protected Left-Turn Phasing Priority Studies for those locations.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan209-937-8243parviz.chitsazan
Plan Holder's ListChyerle Leach209-937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (2-24-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: M17023
General Information
Due Date:February 23, 2017
Opening Time:12:00 p.m.
Published Date:January 26, 2017
Last Updated:February 22, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - PERSHING AVENUE SEWER TRUNK LINE REHABILITATION
Professional design services for the Pershing Avenue Sewer Trunk Line Rehabilitation Project. Sewer line is located along Pershing Avenue between Church Street and Navy Drive and along Church Street between Orange Street and Pershing Avenue.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rates link
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project Manager Karla Cervantes(209) 937-8492Karla.Cervantes@stocktonca.gov
Plan Holder's List Analissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions & Answers (2-22-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (2-1-17)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1602
General Information
Due Date:February 22, 2017
Opening Time:12:00 p.m.
Published Date:January 31, 2017
Last Updated:January 31, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - ALEXANDRIA AND FIVE MILE SLOUGH CULVERT REPLACEMENT PROJECT
Work consists of assessing the existing conditions in Five Mile Slough and Alexandria Place, researching the history of Five Mile Slough, identification of responsibility for each agency, and providing alternatives for replacing/rehabbing the existing culverts in the slough.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerMohammad Sadiq209-937-8299mohammad.sadiq@stocktonca.gov
Plan Holder's ListChyerle Leach209-937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (2-10-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: SEB_17_002
General Information
Due Date:February 09, 2017
Opening Time:12:00 p.m.
Published Date:January 05, 2017
Last Updated:January 05, 2017
Bid Orientation:Job Walk: Tuesday, January 17, 2017, 9:00 a.m. First Location: Municipal Service Center, 1465 S. Lincoln Street, Stockton, CA 95206. Immediately following - Second Location: Regional Wastewater Control Facilities, 2500 Navy Drive, Stockton, CA 95206. Both Locations are Mandatory.
Description:REQUEST FOR PROPOSALS (RFP) - LARGE QUANTITY GENERATOR AND CONDITIONALLY EXEMPT SMALL QUANTITY GENERATOR - HAZARDOUS WASTE MANAGEMENT SERVICES
Hazardous waste handling for City departments to include identification, profiling, packaging, removal, transporting, disposing, and complying with relevant regulations.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerChanel Vanderpool(209) 937-8370chanel.vanderpool@stocktonca.gov
Plan Holder's ListChyerle A. Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Job Walk Sign-In Sheet (1-18-17)
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-17-058
General Information
Due Date:February 09, 2017
Opening Time:3 p.m.
Published Date:January 17, 2017
Last Updated:February 07, 2017
Bid Orientation:N/A
Description:2017 PAVEMENT MANAGEMENT SYSTEM UPDATE AND SURVEY
Perform pavement condition survey of arterials, urban minor arterials, and collector streets.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerThinh Phan(209) 937-8885Thinh.Phan@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:
Document:Questions and Answers (2-2-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (2-7-17)

 


 

Project Number: OM-17-031
General Information
Due Date:January 27, 2017
Opening Time:3 pm
Published Date:December 30, 2016
Last Updated:January 23, 2017
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - ROOF MAINTENANCE AND LEAK RESPONSE
City-wide roof preventative maintenance and leak response.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Wage Rateslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerPaul Acosta(209) 937-5069Paul.Acosta@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (1-23-17)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holder's List (1-10-17)

 


 

Project Number: PW1526
General Information
Due Date:January 11, 2017
Opening Time:2:00 p.m.
Published Date:December 19, 2016
Last Updated:December 19, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS (RFP) - EL DORADO STREET PEDESTRIAN WARNING SYSTEM UPGRADES
The City is seeking professional services to advise and design replacement of the existing pedestrian-actuated warning systems. The Consultant will provide a study at each crossing to determine what type of improvements are needed to upgrade the pedestrian-actuated warning systems. Communications conduits and cabling maybe needed to connect equipment with adjacent traffic signals. After the City agrees on the type of upgrade to the pedestrian-actuated warning systems, the Consultant will prepare PSE for the pedestrian-actuated warning system. As part of PSE, the Consultant will use the latest ADA, CAMUTCD, and City Standards for the design of pedestrian-actuated warning system. The Consultant will also assist in the construction phase of the project.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerKen Mikawa(209) 037-8410ken.mikawa@stocktonca.gov
Plan Holder's ListChyerle A. Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (12-22-16)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1620
General Information
Due Date:January 05, 2017
Opening Time:12:00 p.m.
Published Date:November 28, 2016
Last Updated:December 13, 2016
Bid Orientation:Job Walk, Thursday, December 8, 2016, 9:00 a.m. at Cesar Chavez Library, 605 N. El Dorado Street, Stockton, CA 95202
Description:REQUEST FOR PROPOSALS (RFP) - CESAR CHAVEZ LIBRARY STAFF AND CHILDREN'S RESTROOM RENOVATIONS AND ADA COMPLIANCE
Professional Design Services for the Cesar Chavez Library Staff and Children's restroom renovations and ADA compliance (2 staff and 2 children's restrooms). Located at 605 N. El Dorado Street, Stockton, CA 95202
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (12-13-16)
Specifications:
There are no Specification documents to view.

 


 

Project Number: M17026
General Information
Due Date:January 05, 2017
Opening Time:12:00 p.m.
Published Date:November 17, 2016
Last Updated:December 20, 2016
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) - NAVY DRIVE AT I-5 SEWER TRUNK LINE
Provide professional engineering services to prepare and preliminary design report for the structural evaluation of the Navy Drive Sewer Trunk Line (54-inch and 42-inch), and prepare the design documents for the repairs of the sewer trunk line (project).
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Rosa AlvarezProject Manager(209) 937-8134Rosa.Alvarez@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (12-13-16)
Specifications:
There are no Specification documents to view.

 


 

Project Number: M17025
General Information
Due Date:January 05, 2017
Opening Time:12:00 p.m.
Published Date:November 29, 2016
Last Updated:December 14, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - DELLA STREET SANITARY SEWER LINE REHABILITATION
Professional design services for the Della Street Sanitary Sewer Line Rehabilitation project. Sewer line located along Della Avenue between Hazelton Avenue and Market Street in Stockton, CA.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad(209) 937-7903ahbid.mohammad@stocktonca.gov
Plan Holder's ListChyerle A. Leach(209) 937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (11-29-16)
Specifications:
There are no Specification documents to view.

 


 

Project Number: M17024
General Information
Due Date:January 05, 2017
Opening Time:12:00 p.m.
Published Date:November 29, 2016
Last Updated:December 20, 2016
Bid Orientation:n/a
Description:REQUEST FOR PROPOSALS (RFP) - MYRTLE STREET SANITARY SEWER LINE REHABILITATION PROJECT
Professional Design Services for the Myrtle Street Sanitary Sewer Line Rehabilitation project. Sewer line is located along Myrtle Avenue between A Street and Filbert Street.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project Manager Ahbid Mohammad(209) 937-7903Ahbid.Mohammad@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (11-29-16)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1618
General Information
Due Date:January 04, 2017
Opening Time:12:00 p.m.
Published Date:November 28, 2016
Last Updated:December 14, 2016
Bid Orientation:Job Walk: Fire Station No. 2, 2:00 p.m., 110 W. Sonora Street, Stockton, CA 95203
Description:REQUEST FOR PROPOSAL (RFP) - FIRE STATION NO. 2 KITCHEN IMPROVEMENTS
Professional design services for the Fire Station No. 2 Kitchen Improvements project located at 110 West Sonora Street in Stockton, CA. 95203
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerAhbid Mohammad209-937-7903ahbid.mohammad@stocktonca.gov
Plan Holder's ListChyerle A. Leach209-937-8412chyerle.leach@stocktonca.gov
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (12-14-16)
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1519_STPL-5008-147
General Information
Due Date:December 01, 2016
Opening Time:2 p.m.
Published Date:November 09, 2016
Last Updated:November 16, 2016
Bid Orientation:November 17, 2016, 1 p.m., City Council Chambers, City Hall, 2nd floor, 425 N. El Dorado Street, Stockton CA 95202
Description:FFY 2015-2016 STREET RESURFACING PROJECT
POSTPONED (See LOC No. 1 below) A Notice Inviting Bids will be advertised at a future date.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 937-8346Omar.Al-hindi@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1 (11-16-16)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Document:Bid Forms

 


 

Project Number: PW1603_BPMP-5008_157
General Information
Due Date:November 09, 2016
Opening Time:12:00 p.m.
Published Date:October 11, 2016
Last Updated:October 11, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - BRIDGE REHABILITATION PROJECT
This project will rehabilitate six (6) bridges. The locations of the bridges are: West Lane over Calaveras River (Bridge No. 29C0157R/L) Pershing Avenue over Calaveras River (Bridge No. 29C0243) Diamond Street over Mormon Slough (Bridge No. 29C0238) Santa Paula Way over Mosher Slough (Bridge No. 29C0240) Aurora Street over Mormon Slough (Bridge No. 29C0235) Turnpike over Walker Slough (Bridge No. 29C0399). Work is to design, obtain environmental clearance and permits, and design support during construction.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerEmilio Morales (209) 937-5654emilio.morales@stocktonca.gov
Plan Holder's ListChyerle A. Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List 10-17-16
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1604_HSIPL-5008__151
General Information
Due Date:October 21, 2016
Opening Time:2:00 p.m.
Published Date:September 22, 2016
Last Updated:September 22, 2016
Bid Orientation:N/A
Description:PEDESTRIAN SIGNAL INSTALLATION (HAWK)
Request for proposals from qualified consulting firms to provide professional consultant services to design the Pedestrian Signal Installation (HAWK) project on Airport Way at E. Sonora St.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerMonique Raqueno209-937-8613monique.raqueno@stocktonca.gov
Plan Holders ListChyerle A. Leach209-937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers 10-13-16
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List - Updated 9-26-16
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-17-001
General Information
Due Date:October 13, 2016
Opening Time:2 pm
Published Date:September 19, 2016
Last Updated:September 21, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL ON-CALL IRRIGATION PUMP REPAIR SERVICES
Multi-year on-call services contract for repair of centrifugal and turbine pump systems (some with Variable Frequency Drives) used for irrigation at park sites and green spaces (green belts, street landscaping, medians, etc.) within the City limits, throughout the City of Stockton.
Award Date:N/A
Related Links:
Description:URL:
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Pla/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerDianne Love(209) 937-8283Dianne.Love@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (9-21-16)
Specifications:
Document:Special Provisions and Scope of Work

 


 

Project Number: OM-17-008
General Information
Due Date:October 06, 2016
Opening Time:12 pm
Published Date:September 13, 2016
Last Updated:September 21, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE STREET RESURFACING PROJECT
Provide professional consultatn services to design the Streets Resurfacing Project No. OM-17-008. The Consultant shall provide preliminary and final engineering services leading to the completion of plans, specifications, and estimates for construction of the planned improvements.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerOmar Al-Hindi(209) 915-1040Omar.Al-Hindi@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 331-6572Miguel.Mendoza@stocktonca.gov
Questions & Answers:
Document:Letter of Clarification No. 1 9-15-16
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (9-21-16)
Plans, Attachments & Agendas:
Document:Attachment A - Project Map
Document:Attachment B - Instructions to Proposers

 


 

Project Number: PW1437_ATPL-5008_143
General Information
Due Date:September 29, 2016
Opening Time:2:00 p.m.
Published Date:September 08, 2016
Last Updated:September 29, 2016
Bid Orientation:n/a
Description:CALAVERAS RIVER BICYCLE AND PEDESTRIAN PATH
The Calaveras River Bicycle and Pedestrian Path Project will provide path improvements for the Class I bike path along the Calaveras River between Brookside Road and Cherokee Road including pavement restoration, ADA improvements, striping and signing, and installation of bollards.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209) 937-8492Karla.Cervantes@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract (9-29-16)
Job Walk & Plan Holder's List:
Document:Plan Holder's List (9-12-16)
Specifications:
Document:Specifications
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms
Document:Plans
Document:State Wage Rates (9-8-16)

 


 

Project Number: OM-16-044
General Information
Due Date:September 15, 2016
Opening Time:2 pm
Published Date:August 23, 2016
Last Updated:September 12, 2016
Bid Orientation:N/A
Description:PRE-CAST CONCRETE FENCE SYSTEM REPAIRS
To procure services of a contractor to provide on-call pre-cast fence system repairs in the Weston Ranch development.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers 9-12-16
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List (9-14-16)
Specifications:
Document:Special Provisions
Document:Instructions to Bidders

 


 

Project Number: PW1606_HSIPL-5008-152
General Information
Due Date:September 07, 2016
Opening Time:12:00 p.m.
Published Date:August 16, 2016
Last Updated:August 30, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - GUARD RAIL AND IMPACT ATTENUATOR INSTALLATION
Proposal from qualified consulting firms to provide design of new and replacement guard rails, impact attenuators and striping at North Little Johns Creek bridge crossing just north of the intersection of South Airport Way and Industrial Drive.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis209-937-8055joshua.lewis@stocktonca.gov
Plan Holder's ListChyerle Leach209-937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions & Answers (8-30-16)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holders List 8-26-16
Notice:
Document:Request for Proposals
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-16-064
General Information
Due Date:August 25, 2016
Opening Time:2 p.m.
Published Date:July 18, 2016
Last Updated:July 18, 2016
Bid Orientation:N/A
Description:ANNUAL ENGINEERING SERVICES FOR STOCKTON CONSOLIDATED LANDSCAPE MAINTENANCE ASSESSMENT DISTRICT NO. 96-2 AND CENTRAL STOCKTON LIGHTING MAINTENANCE ASSESSMENT DISTRICT
Prepare engineering reports for the Stockton Consolidated Landscape Maintenance Assessment District No. 96-2 and the Central Stockton Lighting Maintenance Assessment District
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wageslink
Insurance Requirementslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Planholder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
Document:Request for Proposal
Plans, Attachments & Agendas:
Document:Instructions to Proposers

 


 

Project Number: OM-16-057
General Information
Due Date:August 25, 2016
Opening Time:3 pm
Published Date:July 26, 2016
Last Updated:August 18, 2016
Bid Orientation:August 11, 2016 from 9:00am to 2:00pm at the Civic Memorial Auditorium, Stockton, CA 95202
Description:CITY OF STOCKTON CUSTODIAL SERVICES
Provide Custodial Services at Various Locations Across the City
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerPaul Acosta(209) 937-5069Paul.Acosta@stocktonca.gov
Planholder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:
Document:Letter of Clarification No. 1 (8-18-16)
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holders List (8-22-16)

 


 

Project Number: SEB-17-001
General Information
Due Date:July 28, 2016
Opening Time:2:00 pm
Published Date:July 07, 2016
Last Updated:July 07, 2016
Bid Orientation:n/a
Description:REQUEST FOR QUALIFICATIONS ON-CALL MATERIAL TESTING SERVICES FOR VARIOUS CITY PROJECTS
Statement of Qualifications (SOQ) from qualified consulting firms to provide material testing services (lab testing, materials testing, specialty inspections and related services) for various City projects during construction.
Award Date:N/A
Related Links:
Description:URL:
State Wages 7-6-16link
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wages 7-6-16link
Contacts:
Role:Name:Phone:Email:
Project ManagerJoshua Lewis(209) 937-8055joshua.lewis@stocktonca.gov
Plan Holder's ListChyerle Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (Updated 7-25-16)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Plan Holder's List - Updated 7-20-16
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1427
General Information
Due Date:June 30, 2016
Opening Time:2:00 p.m.
Published Date:May 19, 2016
Last Updated:June 30, 2016
Bid Orientation:n/a
Description:HAMMER LANE WIDENING PHASE 3B
The project will widen Hammer Lane between Alexandria Place and Thornton Road to six lanes. Improvements also include new curb, gutter and sidewalk, landscape median, traffic control, and other work items necessary to do the work.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preference Ordinancelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project Manager Rosa Alvarez(209) 937-8134Rosa.Alvarez@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Job Walk & Plan Holder's List:
Document:Plan Holder's List (6-8-16)
Specifications:
Document:Instructions to Bidders
Document:Specifications
Plans, Attachments & Agendas:
Document:Geotechnical Report
Document:Plans
Document:State Wage Rates (5-19-16)
Document:Bid Forms (updated 6-23-16 per LOC No. 2)

 


 

Project Number: PW1428
General Information
Due Date:June 02, 2016
Opening Time:2:00 p.m.
Published Date:April 20, 2016
Last Updated:June 02, 2016
Bid Orientation:n/a
Description:THORNTON ROAD WIDENING PROJECT
Thornton Road Widening between Pershing Avenue and Bear Creek Bridge
Award Date:N/A
Related Links:
Description:URL:
Local Business Preference Ordinancelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerJames Wong (209) 937-8110James.Wong@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226Analissa.Nunez@stocktonca.gov
Job Walk & Plan Holder's List:
Document:Plan Holder's List (5-11-16)
Specifications:
Document:Instructions to Bidders
Document:Specifications

 


 

Project Number: OM-16-039
General Information
Due Date:April 28, 2016
Opening Time:2 p.m.
Published Date:March 31, 2016
Last Updated:April 28, 2016
Bid Orientation:N/A
Description:COURT RESURFACING PROJECT
Resurfacing and striping basketball and tennis courts at Baxter, Equinoa, Faklis, Fong, Iloilo, Long, Parma, Pitts, Smith, Unity, Weston parks, and the Weston Unit 77 greenbelt.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Prevailing Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937- 8372Susan.Christy@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:
Document:Questions and Answers
Submittals:UPDATED
Document:Bid Abstract (4-28-16)
Job Walk & Plan Holder's List:
Document:Plan Holders List (4-27-16)
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Bid Forms
Document:State Prevailing Wage Rates (3-31-16)

 


 

Project Number: OM-16-026
General Information
Due Date:April 21, 2016
Opening Time:3 p.m.
Published Date:March 24, 2016
Last Updated:March 24, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL - ON CALL PLUMBING MAINTENANCE AND REPAIR SERVICES
The City of Stockton is seeking proposals from State lincesed plumbing contractors for on-call plumbing maintenance and repair services.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preferencelink
Local Employment Ordinancelink
Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerPaul Acosta(209) 937-5069Paul.Acosta@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Plan Holder's List (4-18-16)
Specifications:
Document:Request for Proposal
Document:Instructions to Proposers
Plans, Attachments & Agendas:
Document:San Joaquin County Prevailing Wage (3-24-16)
Document:State Wage Rates (3-24-16)

 


 

Project Number: OM-16-034
General Information
Due Date:March 31, 2016
Opening Time:2 p.m.
Published Date:March 03, 2016
Last Updated:April 04, 2016
Bid Orientation:N/A
Description:SHROPSHIRE, SEABREEZE, AND WESTON GREENBELT REWIRING
Replacement of wire to pathway lights in Weston Ranch on Unit 77 Park/Open space between Manthey and McDougald, the Seabreeze Open Space/PGE Easement west of Pock Lance and in Shropshire Park
Award Date:N/A
Related Links:
Description:URL:
Local Business Preference Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerSusan Christy(209) 937-8372Susan.Christy@stocktonca.gov
Plan Holders ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers
There are no Questions & Answers to view.
Submittals:UPDATED
Document:Bid Abstract
Job Walk & Plan Holder's List:
Document:Plan Holders List (3-28-16)
Specifications:
Document:Instructions to Bidders
Document:Special Provisions
Plans, Attachments & Agendas:
Document:Bid Forms
Document:State Wage Rates (3-3-16)

 


 

Project Number: PW1446_STPL-5008-142
General Information
Due Date:March 10, 2016
Opening Time:2 p.m.
Published Date:February 18, 2016
Last Updated:March 03, 2016
Bid Orientation:February 25, 2016, 10 a.m., City Council Chambers, City Hall, 2nd floor, 425 N. El Dorado Street, Stockton CA 95202
Description:FFY 2014-2015 STREET RESURFACING PROJECT
The resurfacing project will use three resurfacing types of surface treatments, Cape-Seal, Micro-surfacing seal and Slurry-Seal. The project scope includes: repair of base failures crack sealing pavement patch/leveling installing new pavement markings/striping adjusting utilities to post resurfacing resurfacing pavement height (finish pavement elevation) installing electrical traffic loops and detector hand holes installing ADA compliant curb-ramps and truncated domes at round corners and removal and re-installation of curb, gutter and sidewalk.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerThinh Phan(209) 937-8201Thinh.Phan@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Job Walk & Plan Holder's List:
Document:Sign-In Sheet for Pre-Bid Meeting 2-25-16
Document:Plan Holders List 3-7-16
Plans, Attachments & Agendas:
Document:Plans
Document:State Wage Rates (2-18-16)
Document:Bid Forms
Document:Federal Wage Rates (3-3-16)

 


 

Project Number: SW-REVIEW_AUDIT
General Information
Due Date:March 03, 2016
Opening Time:12:00 p.m.
Published Date:February 11, 2016
Last Updated:February 11, 2016
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO CONDUCT A PERFORMANCE REVIEW AND BILLING AUDIT OF FRANCHISED WASTE HAULERS
Request proposals to conduct a Performance Review and Billing Audit of the City's two (2) franchised waste haulers, Republic Services and Waste Management. Performance Review and Billing Audit will follow specifications described in Article 5.1, 6.7 and 8.7 in the Franchise Agreement with the waste haulers.
Award Date:N/A
Related Links:
Description:URL:
State Wageslink
Contacts:
Role:Name:Phone:Email:
Project ManagerSabine Verelst209-937-7579sabine.verelst@stocktonca.gov
Plan HolderChyerle Ann Leach209-937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:2016 Questions and Answers
Document:Letter of Clarification No. 1
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.

 


 

Project Number: OM-16-018
General Information
Due Date:March 03, 2016
Opening Time:4:00 p.m.
Published Date:January 28, 2016
Last Updated:January 28, 2016
Bid Orientation:Mandatory Pre-proposal meeting, Thursday, February 11, 2016, 10:00 a.m., Arnold Rue Community Center, 5758 Lorraine Ave., Stockton, CA 95210
Description:REQUEST FOR PROPOSAL (RFP) CITY-WIDE FACILITIES CONDITION ASSESSMENT
Seeking qualified consultants to provide comprehensive, professional Facilities Condition Assessment services for approximately 120 buildings/structures totaling approximately 837,000 square feet.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerPaul Acosta(209) 937-5069Paul.Acosta@stocktonca.gov
Plan Holder's ListMiguel Mendoza(209) 937-7446Miguel.Mendoza@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions and Answers (2-22-16)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:Pre-Proposal Meeting Sign In Sheet
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1424-HSIPL-5008-136
General Information
Due Date:January 20, 2016
Opening Time:12:00 PM
Published Date:December 23, 2015
Last Updated:January 15, 2016
Bid Orientation:N/A
Description:RE-POST
REQUEST FOR PROPOSAL (RFP) - WEST LANE PEDESTRIAN ACCESS IMPROVEMENTS - The project proposes to construct pedestrian access improvements to increase pedestrian access, improve pedestrian safety and efficiency along West Lane between Knickerbocker Drive and Morada Lane and the west and east frontage roads. The proposed project will construct new curb, gutter, sidewalk, and Americans with Disabilities Act (ADA) compliant ramps, reconstruct existing non-compliant sections of curb, gutter and sidewalk and corner ramps to bring the existing intersections up to ADA standards for wheelchair accessibility, necessary drainage improvements, and install signage and striping. A continuous ADA accessible route between the project limits shall be provided. All improvements will be constructed within the existing right-of way.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Federal Wage Rateslink
Contacts:
Role:Name:Phone:Email:
Project ManagerKarla Cervantes(209)937-8492karla.cervantes@stocktonca.gov
Plan Holder's ListAnalissa Nunez(209) 937-8226analissa.nunez@stocktonca.gov
Questions & Answers:UPDATED
Document:Questions - Answers - Clarifications (1-15-16)
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1417_HSIPL-5008-135
General Information
Due Date:December 10, 2015
Opening Time:3:00PM
Published Date:November 12, 2015
Last Updated:November 10, 2015
Bid Orientation:N/A
Description:REQUEST FOR PROPOSAL (RFP) - ARCH-AIRPORT ROAD AND B STREET INTERSECTION INSTALL TRAFFIC SIGNAL AND SAFETY LIGHTING
Consultant services to design the traffic signal at the intersection of B Street/Arch-Airport Road.
Award Date:N/A
Related Links:
Description:URL:
State Wageslink
Federal Wageslink
Contacts:
Role:Name:Phone:Email:
Project ManagerParviz Chitsazan(209) 937-8243parviz.chitsazan@stocktonca.gov
Plan Holder's ListChyerle Ann Leach(209) 937-8412chyerle.leach@stocktonca.gov
Questions & Answers:UPDATED
Document:Letter of Clarification No. 1
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:UPDATED
Document:PLAN HOLDERS LIST
Notice:UPDATED
Document:Request for Proposal
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW1439_CML-5008-145
General Information
Due Date:October 01, 2015
Opening Time:3:00 p.m.
Published Date:September 03, 2015
Last Updated:September 03, 2015
Bid Orientation:n/a
Description:REQUEST FOR PROPOSAL (RFP) - MINER AVENUE COMPLETE STREETS PROJECT
Provide professional engineering services to prepare Precise Road Plan and Environmental Documents for the PAED phase of the project.
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project ManagerClifton Gayotin(209) 937-8241Clifton.Gayotin@stocktongov.com
Questions & Answers
There are no Questions & Answers to view.
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Notice:
Document:Request for Proposal
Specifications:
There are no Specification documents to view.

 


 

Project Number: PW-15-33
General Information
Due Date:March 26, 2015
Opening Time:2:00 p.m.
Published Date:February 26, 2015
Last Updated:March 16, 2015
Bid Orientation:Mandatory Job Walk Wednesday, March 18, 2015, at 8 a.m. Starts at the McKinley Pool Pump House Vault Access Ramp.
Description:POOL WATER QUALITY AND FILTER SYSTEM MAINTENANCE - Pool mechanical systems operation and water quality control services for Oak, McKinley, Sousa pools and Weber Events Center fountain.
Award Date:N/A
Related Links:
Description:URL:
Local Business Preference Ordinancelink
Local Employment Ordinancelink
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Contacts:
Role:Name:Phone:Email:
Project ManagerVictor Machado(209)937-8899victor.machado@stocktongov.com
Planholder's ListSue Christy(209)937-8372susan.christy@stocktongov.com
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
Document:Job Walk Sign-in Sheet
Specifications:
Document:Special Provisions
Document:Instructions to Bidders
Plans, Attachments & Agendas:
Document:Vicinity Map
Document:State Wage Rates 2015-02-26
Document:Bid Forms

 


 

Project Number: PW1444
General Information
Due Date:March 12, 2015
Opening Time:3:00 p.m.
Published Date:February 19, 2015
Last Updated:March 09, 2015
Bid Orientation:N/A
Description:Request for Proposals to conduct a traffic sign inventory throughout the City of Stockton
Award Date:N/A
Related Links:
There are no Related Links to view.
Contacts:
Role:Name:Phone:Email:
Project EngineerJodi Almassy(209) 937-8302jodi.almassy@stocktongov.com
Questions & Answers:UPDATED
Document:Questions and Answers
Submittals:
There are no Submittals to view.
Job Walk & Plan Holder's List:
There are currently no Job Walk documents to view.
Noticetals
There are no Notice documents to view.
Specifications:
Document:Request for Proposal
Plans, Attachments & Agendas:
There are no Plans, Attachments or Agendas to view.

 


 

Project Number: PW1429-Federal-Project-No.-STPL-5008-132
General Information
Due Date:February 26, 2015
Opening Time:2 p.m.
Published Date:February 04, 2015
Last Updated:March 12, 2015
Bid Orientation:February 17, 2015, 10 a.m., City Council Chambers, City Hall, 2nd floor, 425 N. El Dorado Street, Stockton CA 95202
Description:Street resurfacing project on City streets.
Award Date:N/A
Related Links:
Description:URL:
State Wage Rateslink
Insurance Requirementslink
Construction/Demolition/Recycling Plan/Reportlink
Davis-Bacon Wage Determinationslink
Contacts:
Role:Name:Phone:Email:
Project ManagerEven Marcelo(209) 937-8885even.marcelo@stocktongov.com
Planholder's ListDebra Froshaug(209) 937-8328debra.froshaug@stocktongov.com
Submittals:UPDATED
Document:Bid Abstract
Document:Bid Comparison Sheet
Document:Bid - Knife River Construction
Document:Bid Teichert Construction
Document:Bid - VSS International
Document:Contact Us Site Credits City Web Site Policy Report a Website Problem